United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

BATTERY STORAGE Β· PJM

Battery storage project AG1-212, King George County

Battery storage project AG1-212, King George County is a 7.0 MW battery storage request withdrawn in the PJM interconnection queue, in King George County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedOct 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-212
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Location
King George County, Virginia
Technology
Battery: 7.0 MW
Total requested
7.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
22 September 2020
Proposed online date
December 2022
Withdrawn
October 2020

Location

Marker shows the centre of King George County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in King George County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem