United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESBattery storage interconnection queue in the USA — page 30
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project E0004, Saginaw County Battery storage · Hackett Energy Storage LLC |
104 MW | In study |
| Hardeman BESS Battery storage · Quanah BESS LLC |
104 MW | In study |
| Mineral Springs BESS Battery storage · Burnet County LLC |
104 MW | In study |
| Fudge Ranch BESS Battery storage · Crandall BESS LLC |
104 MW | In study |
| Rockpile Storage Battery storage · Rockpile Storage, LLC |
104 MW | In study |
| Battery storage project AH2-131, Gloucester County Battery storage |
104 MW | In study |
| Bronze Quinta Storage Battery storage · KCE TX 28, LLC |
104 MW | In study |
| Diamond Cowboy Storage Battery storage · Diamond B Storage, LLC |
104 MW | In study |
| Post Trail Energy Battery storage · Post Trail Energy, LLC |
104 MW | In study |
| Gatsby Energy Storage Battery storage · Gatsby Energy Storage LLC |
103 MW | In study |
| Shallow Valley Storage Battery storage · Shallow Valley Storage, LLC |
103 MW | In study |
| Pequin Energy Storage Battery storage · Pequin Energy Storage, LLC |
103 MW | In study |
| Hyacinth Storage Battery storage · Hyacinth Storage, LLC |
103 MW | In study |
| Tioga Pass Battery storage |
103 MW | In study |
| Atticus Energy Storage Battery storage · Atticus Energy Storage |
103 MW | In study |
| Appaloosa Run BESS Battery storage · APPALOOSA RUN STORAGE, LLC |
103 MW | In study |
| Evans Creek Energy Storage Battery storage · Evans Creek Energy Storage LLC |
103 MW | In study |
| Massey Storage Battery storage · Massey Storage, LLC |
103 MW | In study |
| Bonita Bateria Battery storage |
103 MW | In study |
| Third Coast BESS Battery storage · Third Coast BESS LLC |
103 MW | Agreement signed |
| Louisa Energy Storage Battery storage · VESI 49 LLC |
103 MW | Agreement signed |
| Oakdale Storage Battery storage |
103 MW | Agreement signed |
| Seven Flags BESS Battery storage · Seven Flags BESS LLC |
103 MW | Agreement signed |
| Firebird BESS Battery storage · TX BESS 6, LLC |
103 MW | In study |
| Tierra Seca BESS Battery storage · Tierra Seca BESS LLC |
103 MW | Agreement signed |
| Millennium Energy Storage Battery storage |
103 MW | Paused / redesign |
| Bexar ESS Battery storage · Bexar ESS LLC |
103 MW | Agreement signed |
| Madrone Energy Storage Battery storage |
103 MW | Paused / redesign |
| Roost Energy Storage Battery storage · Bluff Creek Energy Storage LLC |
102 MW | In study |
| Amador Storage Battery storage · BT Amador Storage, LLC |
102 MW | Agreement signed |
| Los Nietos Battery storage |
102 MW | Agreement signed |
| Big Five Storage Battery storage · TX BESS 3 LLC |
102 MW | In study |
| Cassia Battery storage |
102 MW | In study |
| Arges BESS Battery storage |
102 MW | In study |
| Prairie Horizon Energy Storage 4 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Blackland Prairie 1 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 6 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 2 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Edgewood BESS 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 1 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 3 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 3 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 4 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 4 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Blackland Prairie 2 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 5 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 3 Battery storage · Tempus Power management LLC |
102 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)724 · 133.4 GW
- West (non-ISO utilities)352 · 82.2 GW
- MISO (Midcontinent)305 · 55.0 GW
- CAISO (California)175 · 48.7 GW
- SPP (Southwest Power Pool)198 · 31.4 GW
- PJM (Mid-Atlantic, Midwest)248 · 29.6 GW
- Southeast (non-ISO utilities)109 · 19.4 GW
- NYISO (New York)84 · 11.1 GW
- ISO-NE (New England)31 · 6,907 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)