United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project J4164, Dane County Gas |
1,203 MW | In study |
| Gas project J4165, Kenosha County Gas |
1,203 MW | In study |
| Gas project J4014, Calumet County Gas |
1,203 MW | In study |
| Solar project G0678, Morrow County Solar |
1,200 MW | In study |
| Solar + storage project G0615, Sherman County Solar + storage |
1,200 MW | In study |
| Solar + storage project IC-942, Glynn County Solar + storage |
1,200 MW | Paused / redesign |
| Battery storage project G0608, Klickitat County Battery storage |
1,200 MW | In study |
| Solar + storage project Q105, Millard County Solar + storage · Intermountain Power Agency |
1,200 MW | In study |
| Spectra Solar Solar · SE DC Devco |
1,200 MW | In study |
| Corvette Wind Onshore wind |
1,200 MW | Paused / redesign |
| Other project G0787, Wasco County Other |
1,200 MW | In study |
| Solar + storage project G0702, Crook County Solar + storage |
1,200 MW | In study |
| Aviation Gas |
1,200 MW | In study |
| Eagle Pines Gas Gas · FGE Power |
1,174 MW | In study |
| Pion Battery storage |
1,168 MW | In study |
| Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 Gas |
1,166 MW | In study |
| Gas project J3941, Deuel County Gas |
1,144 MW | In study |
| Replacement; Oak Creek Units 5-8 Gas |
1,138 MW | In study |
| Battery storage project AI2-457, Charles County Battery storage |
1,122 MW | In study |
| Nuclear project G0998, Benton County Nuclear |
1,120 MW | In study |
| Solstice A Solar + storage |
1,111 MW | In study |
| Gas project G0501, Klamath County Gas |
1,100 MW | In study |
| Malden CCGT Gas · NIPSCO |
1,090 MW | In study |
| Hillside Energy Storage Battery storage |
1,065 MW | In study |
| Musketeers Solar + storage |
1,047 MW | In study |
| Gas project GEN-2024-341, Pittsburg County Gas |
1,045 MW | In study |
| Zeus Armstrong BESS Solar + storage · Armstrong BESS, LLC |
1,043 MW | In study |
| Zeus Scurry BESS Solar + storage · Zeus Scurry BESS |
1,043 MW | In study |
| Zeus Mitchell BESS II Solar + storage · Zeus Mitchell BESS II, LLC |
1,043 MW | In study |
| Zeus Mitchell BESS Solar + storage · Mitchell BESS |
1,043 MW | In study |
| Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2 Gas |
1,040 MW | In study |
| EmberGreen Gas · EmberGreen Energy Center |
1,036 MW | In study |
| Water Rock Solar 2 Solar + storage |
1,034 MW | In study |
| Hecate Energy Arkansas Wind Onshore wind · Hecate Energy Gulf Wind LLC |
1,029 MW | In study |
| Hecate Energy Jamaica Wind Onshore wind · Hecate Energy LLC |
1,029 MW | In study |
| Crusade Battery storage |
1,029 MW | In study |
| Lagoonez Battery storage |
1,029 MW | In study |
| Kickstart Energy Storage VI Battery storage · Kickstart Infrastructure LLC |
1,026 MW | In study |
| Battery storage project Q2405, Maricopa County Battery storage |
1,020 MW | In study |
| Gas project J1813, Desoto County Gas |
1,005 MW | In study |
| Other project Q617, Mohave County Other |
1,000 MW | In study |
| Pumpville Ranch 1 Solar |
1,000 MW | Paused / redesign |
| Solar + storage project G0670, Benton County Solar + storage |
1,000 MW | In study |
| Battery storage project G0914, Douglas County Battery storage |
1,000 MW | In study |
| Solar + storage project G0688, Benton County Solar + storage |
1,000 MW | In study |
| Solar + storage project 25-00394, Esmerelda County Solar + storage |
1,000 MW | In study |
| Solar + storage project Company 238, Nye County Solar + storage |
1,000 MW | In study |
| Solar + storage project Q96, Los Angeles County Solar + storage |
1,000 MW | In study |
| Alisa Solar Energy Complex 2 Solar + storage |
1,000 MW | In study |
| Solar project J4161, Watonwan County Solar |
1,000 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)