United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 25
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Seahawk Storage 2 Battery storage |
150 MW | Withdrawn / abandoned |
| Goal Line Gas |
150 MW | Withdrawn / abandoned |
| Birchwood Energy Battery storage |
150 MW | Withdrawn / abandoned |
| Areva Solar Az I Solar |
150 MW | Withdrawn / abandoned |
| Wildflower Green Energy Farm- Solar Solar |
150 MW | Withdrawn / abandoned |
| Quartz 1 Solar Solar |
150 MW | Withdrawn / abandoned |
| Three Peaks Wind Onshore wind |
150 MW | Withdrawn / abandoned |
| Kings Solar 4 Solar |
150 MW | Withdrawn / abandoned |
| Angiola Valley Solar Ranch Solar |
150 MW | Withdrawn / abandoned |
| Monterey Wind Onshore wind |
150 MW | Withdrawn / abandoned |
| Tulip Storage Battery storage |
150 MW | Withdrawn / abandoned |
| Mule Mountain Solar Project Solar |
150 MW | Withdrawn / abandoned |
| Silvertree Greenworks Solar |
150 MW | Withdrawn / abandoned |
| Quartz 2 Solar Solar |
150 MW | Withdrawn / abandoned |
| Red Mountain Wind Energy Center - C5 Onshore wind |
150 MW | Withdrawn / abandoned |
| Quartzite Solar 7 Solar |
150 MW | Withdrawn / abandoned |
| Miguel Energy Storage Battery storage |
150 MW | Withdrawn / abandoned |
| White Rabbit Battery storage |
150 MW | Withdrawn / abandoned |
| Flannelbush Battery storage |
150 MW | Withdrawn / abandoned |
| Red Mountain Ridge Onshore wind |
150 MW | Withdrawn / abandoned |
| Antelope Valley Renewable Energy Farm - Wind Onshore wind |
150 MW | Withdrawn / abandoned |
| Maricopa California Solar Farms I Solar |
150 MW | Withdrawn / abandoned |
| Sanborn Solar Solar |
150 MW | Withdrawn / abandoned |
| Mojave Winds Onshore wind |
150 MW | Withdrawn / abandoned |
| Cuerno Grande Wind Onshore wind |
150 MW | Withdrawn / abandoned |
| Windcharger ESS Battery storage |
150 MW | Withdrawn / abandoned |
| Manuel Storage Battery storage |
150 MW | Withdrawn / abandoned |
| Maricopa 4 Solar Project Solar |
150 MW | Withdrawn / abandoned |
| Oro Verde Solar Project (Fka Gateway Solar Energy Project) Solar |
150 MW | Withdrawn / abandoned |
| Quartz 3 Solar Solar |
150 MW | Withdrawn / abandoned |
| Tampadero Solar Solar |
150 MW | Withdrawn / abandoned |
| Pacheco Pass Wind Energy Center Onshore wind |
150 MW | Withdrawn / abandoned |
| Iron Mountain Wind Energy Onshore wind |
149 MW | Withdrawn / abandoned |
| Humboldt Energy Facility (Agile Energy) Gas |
147 MW | Withdrawn / abandoned |
| Mojavalon I Solar |
146 MW | Withdrawn / abandoned |
| S. F. Electric Reliability Generating Plant Gas |
145 MW | Withdrawn / abandoned |
| Arrowhead Junction Solar Project Solar |
145 MW | Withdrawn / abandoned |
| Highwind Energy Center Other |
145 MW | Withdrawn / abandoned |
| Walker Ridge Onshore wind |
145 MW | Withdrawn / abandoned |
| Cactus Condor Energy Center Battery storage |
144 MW | Withdrawn / abandoned |
| Grindstone Creek Solar Solar |
143 MW | Withdrawn / abandoned |
| Kavax Storage Battery storage |
142 MW | Withdrawn / abandoned |
| Desert View Suntower Solar |
141 MW | Withdrawn / abandoned |
| Fairmont Solar Generating Station Solar |
141 MW | Withdrawn / abandoned |
| Siberia Phase III Segs Solar |
140 MW | Withdrawn / abandoned |
| Crossroads Wind Onshore wind |
140 MW | Withdrawn / abandoned |
| Harper Lake Energy Storage Battery storage |
140 MW | Withdrawn / abandoned |
| El Dorado Solar Alternate Solar |
140 MW | Withdrawn / abandoned |
| Oso Rojo Golf Course Solar |
140 MW | Withdrawn / abandoned |
| Timber Hills Wind (Fka Hillcrest Wind Power 1) Onshore wind |
138 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)