ONSHORE WIND · CAISO

Iron Mountain Wind Energy

Iron Mountain Wind Energy is a 149 MW onshore wind request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2007 (completed)
  2. Withdrawn / abandonedDec 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
204
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Tortilla-Kramer 115 kV line
Location
San Bernardino County, California
Technology
Wind: 149 MW
Total requested
149 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
19 April 2007
Proposed online date
November 2013
Withdrawn
December 2008

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem