United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) — page 18
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| CMP Biddeford IP 115 kV SS - Louden-Biddeford Area DG Study Solar |
4.9 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
4.9 MW | Withdrawn / abandoned |
| Medway 65 110A - 2023 EE GB ASO Battery storage |
4.9 MW | Withdrawn / abandoned |
| Solar Solar |
4.9 MW | Withdrawn / abandoned |
| Whitins Pond Substation – NG Hopedale West Group Study Battery storage |
4.9 MW | Withdrawn / abandoned |
| HGE Group Study Battery storage |
4.9 MW | Withdrawn / abandoned |
| Puddledock Road 115 kV SS - Augusta Area Study Solar |
4.9 MW | Withdrawn / abandoned |
| Westerly - NG WRI DG Area Study #2 <5 MW Solar |
4.9 MW | Withdrawn / abandoned |
| Whitins Pond Substation – NG Hopedale West Group Study Battery storage |
4.9 MW | Withdrawn / abandoned |
| Pondville - NG Western MA Area Cluster Study Solar |
4.9 MW | Withdrawn / abandoned |
| Solar Solar |
4.9 MW | Withdrawn / abandoned |
| New London - NG WRI DG Area Study #2 <5 MW Solar |
4.9 MW | Withdrawn / abandoned |
| Johnston - NG WRI DG Area Study #2 <5 MW Solar |
4.9 MW | Withdrawn / abandoned |
| Biomass Other |
4.9 MW | Withdrawn / abandoned |
| E. Webster substation - NG Western MA Area Cluster Study Solar |
4.9 MW | Withdrawn / abandoned |
| Puddledock Road 115 kV SS - Augusta Area Study Solar |
4.9 MW | Withdrawn / abandoned |
| CornerStone Power Monson 2 Solar |
4.9 MW | Withdrawn / abandoned |
| Lincolnville 115 kV SS - Midcoast Area DG Study Solar |
4.9 MW | Withdrawn / abandoned |
| Marshfield 739 - EMA ASO Solar + storage |
4.6 MW | Withdrawn / abandoned |
| Sandwich 916 - EMA ASO Solar + storage |
4.6 MW | Withdrawn / abandoned |
| Woonsocket Substation – Tifft ST BESS Battery storage |
4.5 MW | Withdrawn / abandoned |
| CMP West Buxton 115 kV SS - Louden-Biddeford Area DG Study Solar |
4.5 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
4.5 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
4.5 MW | Withdrawn / abandoned |
| Old Baptist Road Substation - NG Western RI DG Area Study Solar |
4.4 MW | Withdrawn / abandoned |
| Johnston Substation - NG Western RI DG Area Study Solar |
4.3 MW | Withdrawn / abandoned |
| Individual @ Piper Other |
4.1 MW | Withdrawn / abandoned |
| Wellfleet 976 - EMA ASO Solar + storage |
4.1 MW | Withdrawn / abandoned |
| Old Baptist Road - NG WRI DG Area Study #2 <5 MW Solar |
4.0 MW | Withdrawn / abandoned |
| CMP Moshers/Prides Corner 115 kV SS - Greater Portland Area DG Study Other |
4.0 MW | Withdrawn / abandoned |
| Solar Solar |
4.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
4.0 MW | Withdrawn / abandoned |
| Solar Solar |
4.0 MW | Withdrawn / abandoned |
| Community Power Group, 24 Middle Road, Ellington, CT Solar |
4.0 MW | Withdrawn / abandoned |
| Harwich 968 - EMA ASO Solar + storage |
4.0 MW | Withdrawn / abandoned |
| HGE Group Study Gas |
4.0 MW | Withdrawn / abandoned |
| Individual @ Partridge Solar + storage |
4.0 MW | Withdrawn / abandoned |
| Group @ Orchard Solar + storage |
4.0 MW | Withdrawn / abandoned |
| USS Vineyard Solar, Somers Rd Solar |
4.0 MW | Withdrawn / abandoned |
| Verogy - Thrall Rd, East Windsor Solar |
4.0 MW | Withdrawn / abandoned |
| E. Winchendon Substation - NG Western MA Area Cluster Study Solar |
3.9 MW | Withdrawn / abandoned |
| Hydro Hydro |
3.9 MW | Withdrawn / abandoned |
| Medway 65 110B - 2023 EE GB ASO Solar + storage |
3.9 MW | Withdrawn / abandoned |
| Mason 115 kV SS - Midcoast Area DG Study Solar |
3.9 MW | Withdrawn / abandoned |
| Hopkinton 126 - EMA ASO Solar + storage |
3.9 MW | Withdrawn / abandoned |
| Drumrock - NG Western RI DG Area Study Solar |
3.8 MW | Withdrawn / abandoned |
| Wind Onshore wind |
3.8 MW | Withdrawn / abandoned |
| Valley 715 - EMA ASO Solar + storage |
3.7 MW | Withdrawn / abandoned |
| EE CT DER Group Study Solar |
3.7 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
3.6 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)