United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
SOLAR Β· ISO-NESolar
Solar is a 4.9 MW solar request withdrawn in the ISO-NE interconnection queue, in Berkshire County, Massachusetts, connecting to NU.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 990
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NU
- Connection point (POI)
- Eversource Partidge station
- Location
- Berkshire County, Massachusetts
- Technology
- Solar: 4.9 MW
- Total requested
- 4.9 MW
- Queue status
- Withdrawn
- Entered queue
- 9 April 2020
- Proposed online date
- November 2023
- Withdrawn
- June 2025
Location
Marker shows the centre of Berkshire County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Berkshire County
- Bear Swamp Unit 1 and 2 UpgradeBattery storage Β· 66.0 MW Β· agreement signed
- Berkshire Wind IncreaseOnshore wind Β· 4.6 MW Β· agreement signed
- Battery StorageBattery storage Β· 290 MW Β· in study
- Battery StorageBattery storage Β· 170 MW Β· in study
- Battery StorageBattery storage Β· 136 MW Β· in study
- Bear Swamp Pump Load increaseBattery storage Β· 333 MW Β· built
- Bear Swamp Pumping Load IncreaseBattery storage Β· 333 MW Β· built
- Altresco Increase (winter)Gas Β· 193 MW Β· built
- Hoosac Wind ProjectOnshore wind Β· 28.5 MW Β· built
- Berkshire Wind Power ProjectOnshore wind Β· 15.0 MW Β· built
- Syncarpha Blandford Solar plus battery storageSolar + storage Β· 5.0 MW Β· built
- Bear Swamp Upper Yard substation - NG Western MA Area Cluster StudySolar Β· 2.5 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem