United States › Grid › Interconnection queues › Massachusetts

BATTERY STORAGE · ISO-NE

Whitins Pond Substation – NG Hopedale West Group Study

Whitins Pond Substation – NG Hopedale West Group Study is a 4.9 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Worcester County, Massachusetts, connecting to NGRID.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1307
Grid region
ISO-NE (New England)
Utility / transmission owner
NGRID
Connection point (POI)
NG Feeder 320W5, Whitins Pond T1
Location
Worcester County, Massachusetts
Technology
Battery: 4.9 MW
Total requested
4.9 MW
Queue status
Withdrawn
Entered queue
9 September 2022
Proposed online date
December 2025
Withdrawn
June 2025

Location

Marker shows the centre of Worcester County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Worcester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem