Woonsocket Substation – Tifft ST BESS

Woonsocket Substation – Tifft ST BESS is a 4.5 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Providence County, Rhode Island.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2024 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1594
Grid region
ISO-NE (New England)
Connection point (POI)
RIE feeder 26W7, Woonsocket Substation
Location
Providence County, Rhode Island
Technology
Battery: 4.5 MW
Total requested
4.5 MW
Queue status
Withdrawn
Entered queue
15 November 2024
Proposed online date
December 2026
Withdrawn
June 2025

Location

Marker shows the centre of Providence County; the queue data does not give exact sites.

Power plants in Rhode Island · Transmission lines in Rhode Island

Other requests in Providence County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem