United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

SOLAR Β· ISO-NE

Solar

Solar is a 4.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Windham County, Connecticut, connecting to NU.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandonedJan 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1167
Grid region
ISO-NE (New England)
Utility / transmission owner
NU
Connection point (POI)
Eversource Tracy 14M substation circuit 14M9
Location
Windham County, Connecticut
Technology
Solar: 4.0 MW
Total requested
4.0 MW
Queue status
Withdrawn
Entered queue
4 October 2021
Proposed online date
January 2023
Withdrawn
January 2023

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Windham County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem