United States › Grid › Interconnection queues › Massachusetts
SOLAR + STORAGE · ISO-NESolar + Battery Storage
Solar + Battery Storage is a 4.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Barnstable County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedSep 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1126
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource West 22.8kV CKT #4-77-450 (POLE#429/8)
- Location
- Barnstable County, Massachusetts
- Technology
- Solar: 4.0 MW · Battery
- Total requested
- 4.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress
- Queue status
- Withdrawn
- Entered queue
- 21 April 2021
- Proposed online date
- February 2022
- Withdrawn
- September 2022
Location
Marker shows the centre of Barnstable County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Barnstable County
- Battery StorageBattery storage · 500 MW · in study
- Canal 3Gas · 333 MW · built
- ENA Old Falmouth Road PV + StorageSolar + storage · 4.8 MW · built
- Battery StorageBattery storage · 200 MW · withdrawn
- Energy StorageBattery storage · 150 MW · withdrawn
- Battery StorageBattery storage · 143 MW · withdrawn
- Group @ Hatchville 936 - EMA ASOSolar + storage · 18.5 MW · withdrawn
- WindOnshore wind · 14.9 MW · withdrawn
- Eversource Group @ Sandwich 916Solar + storage · 11.8 MW · withdrawn
- Group @ Orleans 975 - EMA ASOSolar + storage · 10.0 MW · withdrawn
- Eversource Group @ Valley 715Solar + storage · 10.0 MW · withdrawn
- Eversource Group @ Falmouth 993Solar + storage · 8.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem