🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Massachusetts

BATTERY STORAGE · ISO-NE

Medway 65 110A - 2023 EE GB ASO

Medway 65 110A - 2023 EE GB ASO is a 4.9 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Middlesex County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2024 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1492
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource Medway 65 110A
Location
Middlesex County, Massachusetts
Technology
Battery: 4.9 MW
Total requested
4.9 MW
Queue status
Withdrawn
Entered queue
26 January 2024
Proposed online date
December 2026
Withdrawn
June 2025

Location

Marker shows the centre of Middlesex County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Middlesex County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem