United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in ERCOT (Texas) — page 18
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Wichita County Mawson Storage Battery storage · DM-WCM, LLC |
154 MW | In study |
| Kit Fox Storage Battery storage · Kit Fox Storage, LLC |
154 MW | In study |
| Grimes Solar Solar · CG Grimes County LLC |
154 MW | In study |
| Palisade BESS Battery storage · Flexen USA LLC |
154 MW | In study |
| Thunder Road Energy Storage Battery storage · Hecate Grid Thunder Road Storage LLC |
153 MW | In study |
| Dionysus Solar Solar + storage · Dionysus Solar, LLC |
153 MW | In study |
| Cairos Solar Solar + storage · Cairos Solar, LLC |
153 MW | In study |
| Eighteenmile Solar SLF Solar + storage · Weser Solar, LLC |
153 MW | In study |
| Senator Aggreko Storage Solar + storage · Senator Aggreko Storage LLC |
153 MW | In study |
| Silver Dollar Storage Solar + storage · Silver Dollar Solar Project, LLC |
153 MW | In study |
| Pradera Storage Solar + storage · Pradera Storage, LLC |
153 MW | In study |
| Damia Storage Solar + storage · Damia Solar, LLC |
153 MW | In study |
| Fluvanna Max Solar SLF Solar + storage · Fluvanna Max Solar LLC |
153 MW | In study |
| Stockdale Solar Solar |
153 MW | Paused / redesign |
| Palomino Storage Solar + storage · Palomino Renewables |
153 MW | In study |
| Mariah Del Este Wind Onshore wind |
153 MW | Paused / redesign |
| Young Wind II SLF Onshore wind |
152 MW | Paused / redesign |
| Tejano Storage Battery storage · Tejano Storage, LLC |
152 MW | In study |
| Heartfield Storage Other · Belltown Power Texas |
152 MW | Paused / redesign |
| Jaguarundi Energy Storage Battery storage · PowerPulse LLC |
152 MW | In study |
| Palladium Storage Battery storage · Palladium Energy Storage LLC |
152 MW | In study |
| Rock N' Roll Solar SLF Solar + storage · Rock N‚Äô Roll Solar, LLC |
152 MW | In study |
| Kuy Creek Storage 1 SLF Solar + storage · Kuy Creek Storage 1 LLC |
152 MW | In study |
| Windmill Ridge Storage Battery storage · BT WMR Storage, LLC |
151 MW | In study |
| GPlains Solar Solar + storage · Gypsum Plains Solar, LLC |
151 MW | In study |
| Gotham BESS Battery storage · AEU BATTERY PROJECT IV LLC |
151 MW | In study |
| Rocky Point BESS Battery storage · Nicole BESS |
151 MW | In study |
| Violet Storage Battery storage · VIOLET STORAGE |
151 MW | In study |
| Bluebonnet Trail Solar Solar · Bluebonnet trail solar LLC |
151 MW | In study |
| Maleza Storage Solar + storage · Brush Storage, LLC |
151 MW | In study |
| Pollo Pinto Solar Solar · TX Palo Pinto SB 6, LLC |
151 MW | In study |
| Amerada Storage Solar + storage · Amerada Solar, LLC |
151 MW | In study |
| Field Marshal Storage Battery storage · Field Marshal Storage LLC |
151 MW | In study |
| Ulysses Crossing Storage Battery storage |
151 MW | Paused / redesign |
| Pecan Ridge Battery storage · Luminous Energy Renewables LLC |
151 MW | In study |
| Goldfinch Solar Solar + storage · BT DJ4M Solar, LLC |
151 MW | In study |
| New Shepherd Solar Solar · New Shepherd Energy Center, LLC |
151 MW | In study |
| Darkwood Solar Solar + storage · Mustang Creek Solar, LLC |
151 MW | In study |
| Macho Creek BESS Battery storage · Macho Creek BESS, LLC |
151 MW | In study |
| Bottom Grass BESS II Solar + storage · Flint Rock Solar Project, LLC |
151 MW | In study |
| Driet BESS Battery storage · Driet BESS LLC |
151 MW | In study |
| Dunlay Solar Solar · Medina PV, LLC |
151 MW | In study |
| Stewart Grady BESS Battery storage · Grady BESS |
151 MW | In study |
| Realitos Solar SLF Solar + storage · Mesquite Creek LLC |
151 MW | In study |
| Mountain Springs BESS Battery storage · Mountain Springs BESS |
151 MW | In study |
| Yorktown BESS Battery storage · Navitas Energy LLC |
151 MW | In study |
| Darkwood BESS Solar + storage · Mustang Creek Solar, LLC |
151 MW | In study |
| Oriole BES Solar + storage · Rolling Plains Solar |
150 MW | In study |
| Hawkins BESS Battery storage · BRP BLUE TOPAZ 7, LLC |
150 MW | In study |
| Cashel BESS Battery storage · TIPPSOL LLC |
150 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)