🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Pecan Ridge

Pecan Ridge is a 151 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Mcculloch County, Texas.

Queue statusIn planning
  1. PlanningQueued Dec 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
27INR0593
Grid region
ERCOT (Texas)
Developer
Luminous Energy Renewables LLC
Connection point (POI)
60386 HEARTLAN2A 69kV
Location
Mcculloch County, Texas
Technology
Battery: 151 MW
Total requested
151 MW
Study phase
SS Started, FIS Started, No IA
Queue status
Active
Entered queue
17 December 2025
Proposed online date
June 2027

Location

Marker shows the centre of Mcculloch County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Mcculloch County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem