United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 117
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Geranium Energy Storage Battery storage |
51.4 MW | In study |
| Proving Ground BESS Solar + storage · Lantana Solar LLC |
51.4 MW | In study |
| Solar project AH1-227, Wise County Solar · Virginia Electric and Power Company |
51.3 MW | In study |
| Solar project Q104, Pinal County Solar |
51.3 MW | In study |
| Gas project AH1-703, Bergen County Gas · Parkway Generation Operating LLC |
51.3 MW | In study |
| GPlains Storage Solar + storage · Gypsum Plains Solar, LLC |
51.3 MW | In study |
| Big River BESS Solar + storage · Rio Grande River Solar LLC |
51.3 MW | In study |
| Ayass BESS Battery storage · Harvick BESS, LLC |
51.3 MW | In study |
| Black Bear BESS Solar + storage · ESCONDIDO DRAW RESOURCES, LLC |
51.2 MW | In study |
| Gas project J3213, Hennepin County Gas |
51.0 MW | In study |
| Solar project 268, Richland County Solar |
51.0 MW | In study |
| Crocus Storage Solar + storage · Crocus Solar, LLC |
51.0 MW | In study |
| Blanket Ranch North Storage Solar + storage · Blanket Ranch North Solar, LLC |
50.9 MW | In study |
| Volunteer Storage Battery storage · Blackjack Storage LLC |
50.6 MW | In study |
| Hooper Solar Solar + storage · BT Brown Solar, LLC |
50.5 MW | In study |
| Township Power Bank Battery storage |
50.5 MW | In study |
| Verbena Energy Storage Battery storage |
50.5 MW | In study |
| Stegall Storage Solar + storage · BT Martin Solar, LLC |
50.5 MW | In study |
| Albatross BESS Battery storage · Albatross Solar, LLC |
50.4 MW | In study |
| Pearl Crescent Storage Solar + storage · RWE Solar Development, LLC |
50.3 MW | In study |
| Surfside Energy Storage Battery storage · Rocky Mountain Energy Holdings, LLC |
50.3 MW | In study |
| Surplus; J1751 Solar + storage |
50.3 MW | In study |
| Solar project AI2-244, Nottoway County Solar |
50.3 MW | In study |
| Findley Solar Solar + storage · Gransolar Texas Sixteen, LLC |
50.3 MW | In study |
| Marick Rose BESS Battery storage · Marick BESS |
50.2 MW | In study |
| Fort Chadbourne Cattle BESS Battery storage · Fort Chadbourne BESS |
50.2 MW | In study |
| Makalu Solar Solar · Abei Energy Green X LLC |
50.2 MW | In study |
| Beeman BESS Battery storage · Beeman BESS LLC |
50.2 MW | In study |
| Battery storage project GEN-2024-243, Crawford County Battery storage |
50.1 MW | In study |
| Voyager Storage Battery storage · EDF Renewables Development, Inc. |
50.1 MW | In study |
| Tokyo TxHSR TPSS EW-1 Other · Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Battery storage project 22-07253, Weld County Battery storage |
50.0 MW | In study |
| Solar project 25-041825, Larimer County Solar |
50.0 MW | In study |
| Battery storage project 24-242, Polk County Battery storage |
50.0 MW | In study |
| Solar + storage project GI-2022-160, Imperial County Solar + storage |
50.0 MW | In study |
| Solar project J1604, Henderson County Solar |
50.0 MW | In study |
| Solar project 956852, Darlington County Solar |
50.0 MW | In study |
| Gas project 2024-G6, Mohave County Gas |
50.0 MW | In study |
| Battery storage project AJ1-001, Mecklenburg County Battery storage |
50.0 MW | In study |
| Battery storage project AG2-370, Allen County Battery storage · Tillman Storage LLC |
50.0 MW | In study |
| Solar project 963122, Laurens County Solar |
50.0 MW | In study |
| Surplus; J1369 Other |
50.0 MW | In study |
| Kifer BESS 1 Battery storage |
50.0 MW | In study |
| Battery storage project AI2-042, Louisa County Battery storage |
50.0 MW | In study |
| Battery storage project 956218, Nash County Battery storage · Duke Energy Progress LLC |
50.0 MW | In study |
| Nuclear project 25RSC-002, Roane County Nuclear |
50.0 MW | In study |
| Pike County Solar Solar |
50.0 MW | Paused / redesign |
| Sandlot IFB Battery storage · Sandlot Energy LLC |
50.0 MW | In study |
| Battery storage project GEN-2024-SR17, Kay County Battery storage |
50.0 MW | In study |
| Solar project J1935, Dane County Solar |
50.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)