United States › Grid › Interconnection queues › Arizona

SOLAR · WEST

Solar project Q104, Pinal County

Solar project Q104, Pinal County is a 51.3 MW solar request in interconnection study in the West interconnection queue, in Pinal County, Arizona, connecting to Salt River Project.

Queue statusIn planning
  1. PlanningQueued May 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
Q104
Grid region
West (non-ISO utilities)
Utility / transmission owner
Salt River Project
Connection point (POI)
Abel 69 kV
Location
Pinal County, Arizona
Technology
Solar: 51.3 MW
Total requested
51.3 MW
Queue status
Active
Entered queue
3 May 2023
Proposed online date
June 2025

Location

Marker shows the centre of Pinal County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in Pinal County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem