United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 114
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project GEN-2024-019, Gage County Gas |
62.0 MW | In study |
| Cerulean Solar and Mulberry BESS Solar · Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
62.0 MW | In study |
| Dewdrop Wind Onshore wind · Dewdrop Wind LLC |
62.0 MW | In study |
| Solar project 25RSC-006, Mcnairy County Solar |
62.0 MW | In study |
| Gas project GEN-2024-017, Lancaster County Gas |
62.0 MW | In study |
| Gas project PIS090, Utah County Gas · PacifiCorp |
62.0 MW | In study |
| Little Star Solar Solar · RWE Clean Energy Development, LLC |
61.6 MW | In study |
| Beaverhead Solar SLF Solar + storage · Beaverhead Solar, LLC |
61.5 MW | In study |
| Beaverhead Storage SLF Solar + storage · Beaverhead Solar, LLC |
61.5 MW | In study |
| Centennial Solar Solar · Centennial AD 8 LLC |
61.4 MW | In study |
| Solar project 336, Gilchrist County Solar · Seminole Electric Cooperative, Inc |
61.2 MW | Paused / redesign |
| Nymphaea Storage Solar + storage · Nymphaea Solar, LLC |
61.0 MW | In study |
| Celeste Energy Storage Battery storage |
60.9 MW | Paused / redesign |
| Battery storage project AG2-384, Chesterfield County Battery storage · Virginia Electric and Power Company |
60.8 MW | In study |
| Battery storage project S0029, Crook County Battery storage |
60.8 MW | In study |
| Fallstone Solar SLF Solar + storage · Fallstone Solar, LLC |
60.6 MW | In study |
| Battery storage project AI2-307, Cecil County Battery storage |
60.5 MW | In study |
| Hondo Arroyo Solar Solar + storage · Hondo Creek Solar, LLC |
60.4 MW | In study |
| Borden Dino BESS Solar + storage · Borden Dino Solar, LLC |
60.3 MW | In study |
| Tipperary Solar Solar · Tippsol |
60.2 MW | In study |
| Stonewall Solar Solar + storage · Stonewall PV, LLC |
60.2 MW | In study |
| Lampe Solar Solar · Gransolar Texas Seven LLC |
60.2 MW | In study |
| Surplus; J878 Other |
60.0 MW | In study |
| Solar project J1889, Linn County Solar |
60.0 MW | In study |
| Moon Corner Solar Solar · Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
60.0 MW | In study |
| Gas project 419, Martin County Gas · FPL |
60.0 MW | In study |
| Solar project AG2-171, Lunenburg County Solar · Couch Creek Solar LLC |
60.0 MW | In study |
| Battery storage project J1863, Otsego County Battery storage |
60.0 MW | In study |
| Battery storage project J1880, Ottawa County Battery storage |
60.0 MW | In study |
| Battery storage project J2376, Shelby County Battery storage |
60.0 MW | In study |
| Indigo Storage 4 Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| Solar project 286, Orangeburg County Solar |
60.0 MW | In study |
| Columbia County 1 Solar · Hecate Energy Columbia County 1, LLC |
60.0 MW | In study |
| Solar project AI1-105, Luzerne County Solar |
60.0 MW | In study |
| Cayuga Solar Solar · Cayuga Lake Solar, LLC |
60.0 MW | In study |
| Edwards Calverton Battery Storage Battery storage · Edwards Calverton Battery Storage |
60.0 MW | In study |
| Gas project 657, Muhlenberg County Gas |
60.0 MW | In study |
| Indigo Storage 2 Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| Surplus; J1067 Other |
60.0 MW | In study |
| Battery storage project AH2-032, Prince William County Battery storage |
60.0 MW | In study |
| Solar project BHCT G19, Pueblo County Solar |
60.0 MW | In study |
| Agate Solar Solar |
60.0 MW | Paused / redesign |
| Taylor Creek Two Solar |
60.0 MW | In study |
| Solar + storage project Q534, Navajo County Solar + storage |
60.0 MW | In study |
| Sweetleaf Solar Solar |
60.0 MW | Paused / redesign |
| Battery storage project G0708, Morrow County Battery storage |
60.0 MW | In study |
| Indigo Storage Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| Battery storage project G0707, Morrow County Battery storage |
60.0 MW | In study |
| Solar project J1649, Mccracken County Solar |
60.0 MW | In study |
| Kce NY 21 Battery storage · KCE NY 21, LLC |
60.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)