United States › Grid › Interconnection queues › Maryland
BATTERY STORAGE · PJMBattery storage project AI2-307, Cecil County
Battery storage project AI2-307, Cecil County is a 60.5 MW battery storage request in interconnection study in the PJM interconnection queue, in Cecil County, Maryland, connecting to DPL.
Queue statusIn planning
- PlanningQueued Mar 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AI2-307
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Colora 230 kV
- Location
- Cecil County, Maryland
- Technology
- Battery: 60.5 MW
- Total requested
- 60.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 3 March 2023
- Proposed online date
- September 2026
Location
Marker shows the centre of Cecil County; the queue data does not give exact sites.
Other requests in Cecil County
- Wildcat PointGas · 834 MW · built
- Rock SpringsGas · 465 MW · built
- Rock SpringsGas · 465 MW · built
- Wildcat PointGas · 166 MW · built
- Wildcat PointGas · 90.0 MW · built
- Rock Springs Units #3 & #4Gas · 60.0 MW · built
- Rock Springs Units 3 & 4Gas · 20.0 MW · built
- Rocks Springs 1 & 2Gas · 8.7 MW · built
- Rock Springs Units #1 & #2Gas · 2.0 MW · built
- Battery storage project AF2-208, Cecil CountyBattery storage · 101 MW · withdrawn
- Solar project AB2-182, Cecil CountySolar · 20.0 MW · withdrawn
- Crouse Solar ProjectSolar · 10.0 MW · withdrawn