United States βΊ Grid βΊ Interconnection queues βΊ Maryland
BATTERY STORAGE Β· PJMBattery storage project AF2-208, Cecil County
Battery storage project AF2-208, Cecil County is a 101 MW battery storage request withdrawn in the PJM interconnection queue, in Cecil County, Maryland, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-208
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Colora 230 kV
- Location
- Cecil County, Maryland
- Technology
- Battery: 101 MW
- Total requested
- 101 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 24 March 2020
- Proposed online date
- October 2022
- Withdrawn
- September 2023
Location
Marker shows the centre of Cecil County; the queue data does not give exact sites.
Other requests in Cecil County
- Battery storage project AI2-307, Cecil CountyBattery storage Β· 60.5 MW Β· in study
- Wildcat PointGas Β· 834 MW Β· built
- Rock SpringsGas Β· 465 MW Β· built
- Rock SpringsGas Β· 465 MW Β· built
- Wildcat PointGas Β· 166 MW Β· built
- Wildcat PointGas Β· 90.0 MW Β· built
- Rock Springs Units #3 & #4Gas Β· 60.0 MW Β· built
- Rock Springs Units 3 & 4Gas Β· 20.0 MW Β· built
- Rocks Springs 1 & 2Gas Β· 8.7 MW Β· built
- Rock Springs Units #1 & #2Gas Β· 2.0 MW Β· built
- Solar project AB2-182, Cecil CountySolar Β· 20.0 MW Β· withdrawn
- Crouse Solar ProjectSolar Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem