United States βΊ Grid βΊ Interconnection queues βΊ Maryland
SOLAR Β· PJMSolar project AB2-182, Cecil County
Solar project AB2-182, Cecil County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Cecil County, Maryland, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2016 (completed)
- Withdrawn / abandonedMay 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB2-182
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Townsend 25kV
- Location
- Cecil County, Maryland
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 29 April 2016
- Proposed online date
- June 2017
- Withdrawn
- May 2016
Location
Marker shows the centre of Cecil County; the queue data does not give exact sites.
Other requests in Cecil County
- Battery storage project AI2-307, Cecil CountyBattery storage Β· 60.5 MW Β· in study
- Wildcat PointGas Β· 834 MW Β· built
- Rock SpringsGas Β· 465 MW Β· built
- Rock SpringsGas Β· 465 MW Β· built
- Wildcat PointGas Β· 166 MW Β· built
- Wildcat PointGas Β· 90.0 MW Β· built
- Rock Springs Units #3 & #4Gas Β· 60.0 MW Β· built
- Rock Springs Units 3 & 4Gas Β· 20.0 MW Β· built
- Rocks Springs 1 & 2Gas Β· 8.7 MW Β· built
- Rock Springs Units #1 & #2Gas Β· 2.0 MW Β· built
- Battery storage project AF2-208, Cecil CountyBattery storage Β· 101 MW Β· withdrawn
- Crouse Solar ProjectSolar Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem