United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA (2023 requests) — page 11
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project GEN-2023-205, Hughes County Solar |
180 MW | In study |
| Battery storage project GEN-2022-136, Bryan County Battery storage |
180 MW | In study |
| Battery storage project GEN-2022-145, Johnston County Battery storage |
180 MW | In study |
| Solar Solar |
180 MW | In study |
| Solar + storage project G0843, Klickitat County Solar + storage |
180 MW | In study |
| McMurtre Storage Battery storage · BT McMurtre Storage, LLC |
176 MW | In study |
| Yooperlite Storage Battery storage · BT Yooperlite Storage, LLC |
176 MW | In study |
| Solar + storage project 725, Bingham County Solar + storage |
175 MW | In study |
| Solar + storage project GEN-2023-193, Harrison County Solar + storage |
175 MW | In study |
| Pethrus BESS Battery storage · Pethrus BESS, LLC |
174 MW | In study |
| Solar project J2759, Arkansas County Solar |
170 MW | In study |
| Solar project IC-1146, Stone County Solar |
170 MW | Paused / redesign |
| Juniperus BESS Solar + storage · BLUE STONE RENEWABLE XXI LLC |
170 MW | In study |
| Solar + storage project Company 253, Clark County Solar + storage |
169 MW | In study |
| Battery Storage Battery storage |
168 MW | In study |
| Zeppelin Energy Storage Battery storage · ZEPPELIN ENERGY STORAGE LLC |
164 MW | In study |
| Weathervane Solar SLF Solar |
161 MW | Paused / redesign |
| Solar project GI-TC-2024-03, Platte County Solar |
160 MW | In study |
| Other project G0969, Linn County Other |
160 MW | In study |
| Other project G0970, Polk County Other |
160 MW | In study |
| Solar + storage project G0880, Lane County Solar + storage |
160 MW | In study |
| Other project G0971, Lane County Other |
160 MW | In study |
| Other project G0886, Linn County Other |
160 MW | In study |
| Stargazer Solar Solar + storage · Stargazer Solar LLC |
158 MW | In study |
| Pecan BESS Battery storage · Gransolar Texas Three LLC |
157 MW | In study |
| Geothermal project GI-2023-174, Imperial County Geothermal |
157 MW | In study |
| Geothermal project GI-2023-176, Imperial County Geothermal |
157 MW | In study |
| Hacienda Solar |
157 MW | In study |
| Argenta Solar |
156 MW | In study |
| Short Creek BESS Solar + storage · Wichita Solar I, LLC |
156 MW | In study |
| Antonio Road BESS Battery storage · Tempus Power management LLC |
156 MW | In study |
| SunWave Solar Solar · Buckeye Nueces Bay Solar LLC |
154 MW | In study |
| Bonaparte BESS Battery storage · Bonaparte BESS, LLC |
154 MW | In study |
| Zinfandel Storage Center Battery storage |
154 MW | In study |
| Kit Fox Storage Battery storage · Kit Fox Storage, LLC |
154 MW | In study |
| Dionysus Solar Solar + storage · Dionysus Solar, LLC |
153 MW | In study |
| Cairos Solar Solar + storage · Cairos Solar, LLC |
153 MW | In study |
| Senator Aggreko Storage Solar + storage · Senator Aggreko Storage LLC |
153 MW | In study |
| Red Dirt Solar Solar + storage |
153 MW | In study |
| Young Wind II SLF Onshore wind |
152 MW | Paused / redesign |
| Onshore wind project S0022, Bingham County Onshore wind |
152 MW | In study |
| Windmill Ridge Storage Battery storage · BT WMR Storage, LLC |
151 MW | In study |
| Gotham BESS Battery storage · AEU BATTERY PROJECT IV LLC |
151 MW | In study |
| Amerada Storage Solar + storage · Amerada Solar, LLC |
151 MW | In study |
| Goldfinch Solar Solar + storage · BT DJ4M Solar, LLC |
151 MW | In study |
| Darkwood Solar Solar + storage · Mustang Creek Solar, LLC |
151 MW | In study |
| Macho Creek BESS Battery storage · Macho Creek BESS, LLC |
151 MW | In study |
| Driet BESS Battery storage · Driet BESS LLC |
151 MW | In study |
| Stewart Grady BESS Battery storage · Grady BESS |
151 MW | In study |
| Realitos Solar SLF Solar + storage · Mesquite Creek LLC |
151 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)291 · 107.5 GW
- CAISO (California)107 · 53.4 GW
- ERCOT (Texas)253 · 51.8 GW
- Southeast (non-ISO utilities)157 · 17.0 GW
- PJM (Mid-Atlantic, Midwest)156 · 14.6 GW
- SPP (Southwest Power Pool)73 · 14.1 GW
- MISO (Midcontinent)22 · 3,354 MW
- ISO-NE (New England)6 · 1,053 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)