United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA (2024 requests) — page 10
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Prospector Energy Storage Battery storage · Prospector Storage LLC |
205 MW | In study |
| South Tripoint BESS Battery storage · South Triangle Energy, LLC |
205 MW | In study |
| Dan Kearney BESS Battery storage · Dan Kearney BESS LLC |
204 MW | Agreement signed |
| Drill Baby Drill BESS Battery storage · SBESS TX8 LLC |
204 MW | In study |
| Sonora High Noon BESS Battery storage · Sonora High Noon, LLC |
204 MW | In study |
| Brookview Road BESS Battery storage · Brookview Reliability Project LLC |
203 MW | Agreement signed |
| Brahman Renewables Storage Solar + storage · Brahman Renewables |
203 MW | In study |
| Caracara Energy Storage Center Battery storage · FRESH AIR ENERGY II, LLC |
203 MW | In study |
| Bigway Solar I Solar · NextEra Energy Interconnection Holdings, LLC |
203 MW | Agreement signed |
| Washington County Solar Solar + storage |
203 MW | In study |
| Coati Energy Storage Battery storage · PowerPulse LLC |
203 MW | In study |
| Carolina Storage Odessa Battery storage · CSE Storage, LLC |
203 MW | In study |
| Techne BESS Battery storage · Techne BESS, LLC |
203 MW | In study |
| Saint Charles Energy Storage Battery storage · RSN STORAGE 001, LLC |
203 MW | In study |
| Ceres BESS Battery storage · Ceres BESS, LLC |
203 MW | In study |
| Prost ESS Battery storage · Prost ESS LLC |
203 MW | In study |
| Trenno BESS Battery storage · JSB1, LLC |
203 MW | Agreement signed |
| Bologna BESS Battery storage · MALONEY BESS LLC |
203 MW | In study |
| Old Victory Energy Center Battery storage · Nova Clean Energy LLC |
203 MW | In study |
| Guajillo Wind Onshore wind · Guajillo Wind LLC |
202 MW | In study |
| Carolina Storage Wichita Falls Battery storage · CSE Storage, LLC |
202 MW | In study |
| Pianissimo BESS II Battery storage · Pianissimo Storage, LLC |
202 MW | In study |
| Bluefox Solar 3 Solar · Industrial November Project LLC |
202 MW | In study |
| Avant Prairie BESS Battery storage · Avant Prairie ESS LLC |
202 MW | In study |
| Texas Cotton Solar Solar · RWE Solar Development, LLC |
202 MW | In study |
| Sun Angel ESS Battery storage · Sun Angel ESS LLC |
202 MW | In study |
| Corvus Solar Solar · Corvus Solar, LLC |
202 MW | Agreement signed |
| Tex-Bar ESS Battery storage · Tex-Bar ESS LLC |
202 MW | In study |
| Padua Grid BESS Unit 3 Battery storage · Padua Grid 3, LLC |
201 MW | Agreement signed |
| Desert Palm BESS Battery storage · Desert Palm BESS LLC |
201 MW | In study |
| Caladium BESS Battery storage · Caladium Storage, LLC |
201 MW | In study |
| Wintergarden BESS Battery storage · Wintergarden BESS LLC |
201 MW | In study |
| Pine Forest BESS 2 Battery storage |
201 MW | Paused / redesign |
| Motif BESS II Battery storage · Motif Storage, LLC |
201 MW | In study |
| Big Rooter West Storage Solar + storage · Big Rooter West, LLC |
201 MW | In study |
| Tarim BESS Battery storage · BRP Tarim BESS LLC |
201 MW | In study |
| Hamlet Solar SLF Solar + storage · Hamlet Solar, LLC |
201 MW | In study |
| Clapton Solar Solar + storage · Clapton Solar |
201 MW | In study |
| Big Rooter East Storage Solar + storage · Big Rooter East, LLC |
201 MW | Agreement signed |
| Hamlet Storage SLF Solar + storage · Hamlet Solar, LLC |
201 MW | In study |
| Cebocell BESS Battery storage · Cebocell, LLC |
201 MW | In study |
| Sengun BESS Battery storage · BRP Blue Topaz 12, LLC |
201 MW | In study |
| Cummins BESS Battery storage · RWE Solar Development, LLC |
201 MW | In study |
| Rio Hondo BESS Battery storage · SBESS TX25 LLC |
201 MW | In study |
| Abeja Solar Farm Solar · Abeja Solar Farm LLC |
201 MW | Agreement signed |
| Cash Mills Storage Center Battery storage · Mills Storage Center |
201 MW | In study |
| Goby Energy Center Battery storage · Goby Energy Center |
201 MW | In study |
| Resaca Oasis Storage Battery storage · Resaca Oasis Storage, LLC |
201 MW | Agreement signed |
| BremRaek BESS Battery storage · BremRaek BESS |
201 MW | In study |
| Blackcat Storage Battery storage · Matagorda ESS, LLC |
201 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)436 · 104.7 GW
- MISO (Midcontinent)290 · 62.9 GW
- West (non-ISO utilities)192 · 45.5 GW
- Southeast (non-ISO utilities)178 · 35.0 GW
- SPP (Southwest Power Pool)81 · 18.0 GW
- NYISO (New York)89 · 15.6 GW
- ISO-NE (New England)15 · 3,285 MW
- PJM (Mid-Atlantic, Midwest)2 · 95.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)