United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESProjects with signed interconnection agreements in Texas — page 10
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Camp Creek Solar SLF Solar + storage · White Rock Solar, LLC |
110 MW | Agreement signed |
| Longfellow BESS II Solar + storage · CENTURY GAS PROCESSING, LLC |
106 MW | Agreement signed |
| Waterloo BESS 1 Solar + storage · Waterloo Solar, LLC |
106 MW | Agreement signed |
| Happy Dog Storage Solar + storage · Rosula Solar LLC |
105 MW | Agreement signed |
| Neutron Storage Battery storage · Elawan Neutron Storage, LLC |
105 MW | Agreement signed |
| Piedra BESS Solar + storage · Piedra Solar, LLC |
104 MW | Agreement signed |
| Third Coast BESS Battery storage · Third Coast BESS LLC |
103 MW | Agreement signed |
| Louisa Energy Storage Battery storage · VESI 49 LLC |
103 MW | Agreement signed |
| Seven Flags BESS Battery storage · Seven Flags BESS LLC |
103 MW | Agreement signed |
| Tierra Seca BESS Battery storage · Tierra Seca BESS LLC |
103 MW | Agreement signed |
| Bexar ESS Battery storage · Bexar ESS LLC |
103 MW | Agreement signed |
| Amador Storage Battery storage · BT Amador Storage, LLC |
102 MW | Agreement signed |
| Remy Jade III Power Station Gas · Remy Jade III Generating, LLC |
102 MW | Agreement signed |
| Stoneridge BESS Battery storage · Stoneridge Solar, LLC |
102 MW | Agreement signed |
| Pamela Heights I Battery storage · Pamela heights I Energy Center LLC |
102 MW | Agreement signed |
| Greyhound Solar - Phase F Solar · ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR |
102 MW | Agreement signed |
| Lucky 7 Solar Solar · Lucky 7 Solar Farm LLC |
102 MW | Agreement signed |
| Lamkin Solar Solar · Commanche Solar, LLC |
102 MW | Agreement signed |
| Raven Storage Battery storage · Raven Storage, LLC |
101 MW | Agreement signed |
| Megamouth Energy Storage Battery storage · GCI Megamouth, LLC |
101 MW | Agreement signed |
| Blue Sky Sol Solar + storage · Blue Sky Solar LLC |
101 MW | Agreement signed |
| Citrus Flatts BESS Battery storage · Citrus Flatts Energy Center, LLC |
101 MW | Agreement signed |
| Matagorda Solar Solar · Matagorda Solar Farm, LLC |
101 MW | Agreement signed |
| Glasgow Storage Solar + storage · Glasgow Solar LLC |
101 MW | Agreement signed |
| Carambola BESS Battery storage · SMT McAllen II LLC |
101 MW | Agreement signed |
| Paradiso BESS Battery storage · VESI 13 |
101 MW | Agreement signed |
| Lupinus Solar 3 Solar + storage · Lupinus Solar 2, LLC |
101 MW | Agreement signed |
| Picadillo BESS Battery storage · Black Mountain Energy Storage II |
101 MW | Agreement signed |
| Rutile BESS Battery storage · Rutile BESS, LLC |
101 MW | Agreement signed |
| Huisache BESS Solar + storage · Huisache Solar, LLC |
101 MW | Agreement signed |
| Long Point Storage Solar + storage · Long Point Storage, LLC |
101 MW | Agreement signed |
| BRP Diran BESS Battery storage · BRP Diran BESS LLC |
101 MW | Agreement signed |
| Hermes Solar Solar + storage · Bell 1 Solar, LLC |
100 MW | Agreement signed |
| Hermes Storage Solar + storage · Bell 1 Storage LLC |
100 MW | Agreement signed |
| Ariji BESS Battery storage · Ariji BESS, LLC |
100 MW | Agreement signed |
| DAMAZO (Second Division) SOLAR Solar · TX Gulf Solar 1 LLC |
100 MW | Agreement signed |
| Ne100B Battery storage |
100 MW | Agreement signed |
| Arroyo Solar Solar + storage · BT Cantwell Solar, LLC |
100 MW | Agreement signed |
| Solar project J483, Liberty County Solar |
100 MW | Agreement signed |
| SS100S Solar |
100 MW | Agreement signed |
| Blue Summit Energy Storage Wind + storage · NextEra Energy Interconnection Holdings, LLC |
100 MW | Agreement signed |
| Ne100S Solar |
100 MW | Agreement signed |
| Cannibal Draw Storage Solar + storage · Cannibal Draw Solar, LLC |
98.6 MW | Agreement signed |
| Midpoint Solar Solar · Midpoint Solar, LLC |
98.3 MW | Agreement signed |
| Rocinante Solar Solar + storage · Brush Country Solar Project, LLC |
95.3 MW | Agreement signed |
| Timmerman Power Plant Phase 2B Gas · Lower Colorado River Authority |
94.2 MW | Agreement signed |
| High Noon Storage Solar + storage · High Noon Solar Project, LLC |
94.0 MW | Agreement signed |
| HappyDogSolar Solar + storage · Rosula Solar LLC |
85.5 MW | Agreement signed |
| Payne Battlecreek Solar · Gransolar Texas Ten, LLC |
85.0 MW | Agreement signed |
| RedSun Solar Solar + storage · Gransolar Texas Twenty Two |
82.6 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)578 · 119.3 GW
- SPP (Southwest Power Pool)18 · 4,003 MW
- West (non-ISO utilities)7 · 950 MW
- MISO (Midcontinent)3 · 332 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)