NESO TEC REGISTER Β· GREAT BRITAINBattery storage projects in the connection queue on the SP Transmission (south Scotland) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Neilston 400kV Greener Grid Park Battery storage Β· Statkraft UK Ltd |
600 MW | Consents Approved |
| Alcemi Devilla Battery Energy Storage Facility Battery storage Β· Alcemi Storage Developments 3 Limited |
500 MW | Consents Approved |
| Kilmarnock South Battery Storage Battery storage Β· Kilmarnock Energy Centre Limited |
500 MW | Consents Approved |
| Rawhills Battery Energy Storage Facility(Coalburn 2) Battery storage Β· Alcemi Storage Developments 6 Limited |
500 MW | Consents Approved |
| Smeaton BESS Battery storage Β· Kona Asset 3 Limited |
228 MW | Consents Approved |
| Highview Hunterston East Cryobattery Battery storage Β· Hvs Siteco Ltd |
200 MW | Consents Approved |
| Hunterston Battery Storage Facility Battery storage Β· Hunterston Grid 1 Ltd |
200 MW | Consents Approved |
| Hunterston Energy Storage Facility Battery storage Β· Hunterston Grid 1 Ltd |
200 MW | Consents Approved |
| Kincardine Battery Storage Facility Battery storage Β· Kincardine Grid 1 Ltd |
200 MW | Consents Approved |
| Kincardine Energy Storage Facility Battery storage Β· Kincardine Grid 1 Ltd |
200 MW | Consents Approved |
| Whitehill Battery Storage Battery storage Β· Whitehill Battery Storage Ltd |
200 MW | Consents Approved |
| WindyHill Energy Storage Facility Battery storage Β· Windyhill Grid 1 LTD |
200 MW | Consents Approved |
| Zenobe Coalburn Battery Storage Battery storage Β· Zenobe Coalburn Limited |
200 MW | Consents Approved |
| Ayr Energy Storage Battery storage Β· Kxp Alpha I Limited |
150 MW | Consents Approved |
| Glennifer Road BESS Battery storage Β· Drax BESS Neilston Limited |
150 MW | Consents Approved |
| Flemyland Battery Storage Battery storage Β· Flemyland Battery Storage Limited |
100 MW | Consents Approved |
| Dolphingstone Farm Battery storage Β· Bssl East Lothian 1 Ltd |
63 MW | Consents Approved |
| Inchbean Energy Park Battery storage Β· Brockwell Storage & Solar Limited |
60 MW | Consents Approved |
| Coylton 275kV Greener Grid Park Battery storage Β· Coylton Energy Limited |
50 MW | Consents Approved |
| Well Street Paisley Battery storage Β· Gas Generation Property Limited |
50 MW | Consents Approved |
| Glenrothes BESS Battery storage Β· Glenrothes BESS Ltd |
46 MW | Consents Approved |
| Balbougie Energy Centre Battery storage Β· Balbougie Energy Centre II Limited |
42 MW | Consents Approved |
| Kellwood Road BESS Battery storage Β· Geocore (Kellwood) Ltd |
40 MW | Consents Approved |
| Drumfad Battery Storage System Battery storage Β· Eku Energy Faune Projects (UK) Limited |
40 MW | Consents Approved |
| Elvanfoot (9.8 MW) Energy Storage Battery storage Β· Elvanfoot Energy Storage Limited |
9.8 MW | Consents Approved |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed βconnection nodesβ are listed but not mapped.