Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· SPT

Smeaton BESS

Smeaton BESS is a 228 MW battery storage project consented, connecting to the SP Transmission (south Scotland) network at Smeaton 400kV, with capacity due from July 2028. The connection agreement is held by Kona Asset 3 Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Jul 2028 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-002635
Customer
Kona Asset 3 Limited
Technology
Energy Storage System
Total capacity
228 MW
Change in this agreement
+228 MW
Capacity effective from
31 July 2028
Connection site
Smeaton 400kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Smeaton Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem