Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· SPT

Kellwood Road BESS

Kellwood Road BESS is a 40 MW battery storage project consented, connecting to the SP Transmission (south Scotland) network at Dumfries 132/33kV, with capacity due from July 2030. The connection agreement is held by Geocore (Kellwood) Ltd.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Jul 2030 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-003710
Customer
Geocore (Kellwood) Ltd
Technology
Energy Storage System
Total capacity
40 MW
Change in this agreement
+40 MW
Capacity effective from
30 July 2030
Connection site
Dumfries 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Dumfries Β· Grid map

Other projects at Dumfries 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem