Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· SPT

Well Street Paisley

Well Street Paisley is a 50 MW battery storage project consented, connecting to the SP Transmission (south Scotland) network at Elderslie 132/33kV, with capacity due from June 2028. The connection agreement is held by Gas Generation Property Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2028 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-002265
Customer
Gas Generation Property Limited
Technology
Energy Storage System
Total capacity
50 MW
Change in this agreement
+50 MW
Capacity effective from
28 June 2028
Connection site
Elderslie 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Elderslie Β· Grid map

Other projects at Elderslie 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem