🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Battery storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown814219.0 GW in total
In planning609scoping or awaiting consent
Consented or building126closest to connecting
Built79connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

814 projects · page 7 of 17
ProjectCapacityStageConnection siteFrom
Stracathro BESS
Battery storage · Opdenergy UK 8 Limited
249 MWScoping Stracathro BESS 275kV Substation
SSEN Transmission (north Scotland)
Jun 2032
Whitehouse BESS station
Battery storage · Igp International Prospecting Limited
249 MWScoping Whitehouse 275kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Aberthaw BESS
Battery storage · Rewe 7 Limited
240 MWScoping Aberthaw B 275/132kV Substation
National Grid (England & Wales)
Oct 2037
Bearsden BESS
Battery storage · Bearsden BESS Ltd
240 MWScoping Bearsden BESS 275Kv Substation
SP Transmission (south Scotland)
Oct 2033
Beddington 1 BESS
Battery storage · Bluestone Beddington 1 Ltd
240 MWScoping London South Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2037
Beddington 2 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping London South Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2037
Burdiehouse BESS
Battery storage · IBV Burdiehouse Energy Park Limited
240 MWScoping Shawfair 400Kv Substation
SP Transmission (south Scotland)
Apr 2034
Butt Lane - Grimsby BESS
Battery storage · Bluestone Butt Lane 1 Ltd
240 MWScoping SOUTH HUMBER CONNECTION NODE A 132kV
National Grid (England & Wales)
Oct 2035
Catsfield
Battery storage · MAS 001 Limited
240 MWScoping Ninfield GSP
National Grid (England & Wales)
Nov 2037
Chessington Estate
Battery storage · Chessington BESS Ltd
240 MWScoping Chessington 132kV
National Grid (England & Wales)
Nov 2037
Cilfynydd 2
Battery storage · Rewe 8 Limited
240 MWScoping Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2037
Coddington
Battery storage · Starlight Energy UK Limited
240 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
CRT Keadby 2
Battery storage · Bluestone Energy Ltd
240 MWScoping Trent Valley North Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2039
Drakelow Power Station 1 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping Derbyshire Connection Node E 132Kv Substation
National Grid (England & Wales)
Oct 2034
Drakelow Power Station 2 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping Derbyshire Connection Node E 132 kV Substation
National Grid (England & Wales)
Oct 2037
Drakelow Power Station 3 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping ERBYSHIRE CONNECTION NODE E 132kV SUBSTATION
National Grid (England & Wales)
Oct 2037
Drakelow Power Station 4
Battery storage · Bluestone Energy Ltd
240 MWScoping Derbyshire Connection Node E 132 kV Substation
National Grid (England & Wales)
Oct 2037
Fairmead and Yewtree Farm
Battery storage · Qair Renewables UK Limited
240 MWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Forepower Lincoln (250) Ltd
Battery storage · Forefuture Energy Ltd
240 MWScoping Navenby 132kV Substation
National Grid (England & Wales)
Oct 2034
Gresham House Cockenzie BESS
Battery storage · Cockenzie Storage Limited
240 MWUnder Construction/Commissioning Meadowmill 400/132kV Substation
SP Transmission (south Scotland)
Jul 2027
Grovers Farm BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping West London Connection Node B 132kV substation
National Grid (England & Wales)
Oct 2037
Henley Downs Farm BESS
Battery storage · Ninfield BESS Ltd
240 MWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2037
High Bardrain Wood & Moor
Battery storage · Bluestone Energy Ltd
240 MWScoping High Bardrain Wood & Moor 132Kv Substation
SP Transmission (south Scotland)
Oct 2033
Hill Farm
Battery storage · Qair Renewables UK Limited
240 MWScoping Capenhurst GSP
National Grid (England & Wales)
Oct 2037
Hipsey BESS
Battery storage · Kona Asset 2 Limited
240 MWScoping Dunstable 400kV Substation
National Grid (England & Wales)
Oct 2032
Intwood Farm BESS
Battery storage · Intwood BESS Ltd
240 MWScoping North Anglia Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2034
Lambeeth 240MW
Battery storage · Ecodev Group Ltd
240 MWScoping Pembroke 400kV Substation
National Grid (England & Wales)
Dec 2037
Mountain Fen
Battery storage · Lightsource Spv 204 Limited
240 MWScoping Coddington 400kV Substation
National Grid (England & Wales)
Sep 2034
NEL Bluebell
Battery storage · SFEL Bluebell Limited
240 MWScoping Leeds North Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
NEL Conway2
Battery storage · JJS 3 Limited
240 MWScoping Leeds North Connection Node C 132kV Substation
National Grid (England & Wales)
Oct 2035
NEL Springfield
Battery storage · UE 3 LTD
240 MWScoping Leeds North Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
NEL Story
Battery storage · Story Energy Limited
240 MWScoping Harker 400kV Substation
National Grid (England & Wales)
Nov 2037
NEL Suggit
Battery storage · SFEL One Limited
240 MWScoping Saltend North GSP
National Grid (England & Wales)
Oct 2035
Ocker Hill - Gresham House
Battery storage · Ocker Hill Storage Limited
240 MWConsents Approved Ocker Hill 275kV Substation
National Grid (England & Wales)
Oct 2029
Siddington BESS Station
Battery storage · Ibv Birtles Hill Energy Park Ltd
240 MWScoping Manchester South connection node A 400kv
National Grid (England & Wales)
Oct 2037
Solomons Farm BESS
Battery storage · Solomons BESS Ltd
240 MWScoping North Kent Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2033
St. Marys Lane - Upminster BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping Warley 132kV Substation
National Grid (England & Wales)
Oct 2036
Stoke Bardolph
Battery storage · Source Galileo Limited
240 MWScoping Trent Valley South Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2034
Torness BESS Station
Battery storage · IBV Torness Energy Park Limited
240 MWScoping Thorntonloch 400kV Substation
SP Transmission (south Scotland)
Oct 2031
Upminster Warley 3
Battery storage · Bluestone Energy Ltd
240 MWScoping Warley 132kV Substation
National Grid (England & Wales)
Oct 2036
Wacton Road Farm
Battery storage · Qair Renewables UK Limited
240 MWScoping North Anglia Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2034
Weaver BESS
Battery storage · Frodsham Devco Limited
240 MWScoping Frodsham 400kV Substation
National Grid (England & Wales)
Oct 2028
Willington BESS Station
Battery storage · Ibv Willington Energy Park Limited
240 MWScoping Derbyshire Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2037
MeyGen Tidal
Battery storage · Meygrid Limited
237 MWConsents Approved Gills Bay GSP
SSEN Transmission (north Scotland)
Apr 2028
Shaw Lane BESS
Battery storage · Shaw Lane BESS Limited
230 MWScoping Leeds North Connection Node E 132KV Substation
National Grid (England & Wales)
Oct 2035
Bendle Farm
Battery storage · Supernova Power BESS Holdings Limited
228 MWScoping Bendle Farm 132kV Substation
SP Transmission (south Scotland)
Oct 2031
Bendle Farm 2.0
Battery storage · Supernova Power BESS Holdings Limited
228 MWScoping Bendle Farm 2.0 132Kv Substation
SP Transmission (south Scotland)
Oct 2031
NEL Lackenby
Battery storage · Newton Energi Limited
228 MWScoping Teeside Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2035
Patford Bridge BESS
Battery storage · Kona Energy Limited
228 MWScoping Derbyshire Connection Node I 400kV Substation
National Grid (England & Wales)
Oct 2037
Smeaton BESS
Battery storage · Kona Asset 3 Limited
228 MWConsents Approved Smeaton 400kV
SP Transmission (south Scotland)
Jul 2028
Page 7 of 17

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.