BATTERY STORAGE Β· SPTBurdiehouse BESS
Burdiehouse BESS is a 240 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Shawfair 400Kv Substation, with capacity due from April 2034. The connection agreement is held by IBV Burdiehouse Energy Park Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2034 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004803
- Customer
- IBV Burdiehouse Energy Park Limited
- Technology
- Energy Storage System
- Total capacity
- 240 MW
- Change in this agreement
- +240 MW
- Capacity effective from
- 30 April 2034
- Connection site
- Shawfair 400Kv Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem