Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Torness BESS Station

Torness BESS Station is a 240 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Thorntonloch 400kV Substation, with capacity due from October 2031. The connection agreement is held by IBV Torness Energy Park Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004904
Customer
IBV Torness Energy Park Limited
Technology
Energy Storage System
Total capacity
240 MW
Change in this agreement
+240 MW
Capacity effective from
31 October 2031
Connection site
Thorntonloch 400kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Thorntonloch · Grid map

Other projects at Thorntonloch 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem