Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTGresham House Cockenzie BESS
Gresham House Cockenzie BESS is a 240 MW battery storage project under construction or commissioning, connecting to the SP Transmission (south Scotland) network at Meadowmill 400/132kV Substation, with capacity due from July 2027. The connection agreement is held by Cockenzie Storage Limited.
Project stageUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingFrom Jul 2027 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-002209
- Customer
- Cockenzie Storage Limited
- Technology
- Energy Storage System
- Total capacity
- 240 MW
- Change in this agreement
- +240 MW
- Capacity effective from
- 31 July 2027
- Connection site
- Meadowmill 400/132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Under Construction/Commissioning
- Connections reform gate
- Gate 2
Connection site
The connection site could not be placed on the map.
Other projects at Meadowmill 400/132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem