Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Hill of Towie 2 Wind Farm Onshore wind · Greenhills 1 Limited |
36 MW | Consents Approved |
| Loganhead Windfarm Onshore wind · Loganhead Wf Limited |
36 MW | Consents Approved |
| St Marys Isle Solar Farm Solar + storage · Grupotec Solar UK 5 Limited |
36 MW | Consents Approved |
| Arbroath Battery Substation Battery storage · Arbroath Limited |
35 MW | Consents Approved |
| Montreathmont Moor Forest Solar + storage · Montreathmont Energy Centre Limited |
34 MW | Consents Approved |
| Glenmuckloch Wind Farm Onshore wind · Glenmuckloch Renewable Energy Limited |
34 MW | Consents Approved |
| Creyke Beck Battery 2 Battery storage · Cbb Spv Limited |
29 MW | Consents Approved |
| MeyGen Tidal Battery storage · Meygrid Limited |
28 MW | Consents Approved |
| Tarland Battery Storage System Battery storage · Tarland Limited |
20 MW | Consents Approved |
| Keithick 16 Solar & BESS Solar + storage · Sirius Ecodev (Keithick) Ltd |
16 MW | Consents Approved |
| Elvanfoot (9.8 MW) Energy Storage Battery storage · Elvanfoot Energy Storage Limited |
9.8 MW | Consents Approved |
| Ayrshire Grid Services Facility Other · Hunterston Grid 3 Ltd |
0 MW | Consents Approved |
| Cilfynydd Grid Stability Services Other · Cilfynydd Grid Services Limited |
0 MW | Consents Approved |
| Eye Grid Services Facility Other · Conrad (Eye) Limited |
0 MW | Consents Approved |
| Necton Greener Grid Park Battery storage · Necton Grid Solutions Limited |
0 MW | Consents Approved |
| Neilston Synchronous Compensation Other · Neilston Grid Services Limited |
0 MW | Consents Approved |
| Sellindge Grid Stability Services Other · Sellindge Grid Services Limited |
0 MW | Consents Approved |
| Swansea Greener Grid Park - Connection 2 Other · Swansea Grid Solutions Limited |
0 MW | Consents Approved |
| Walpole Grid Services Facility Other · Conrad (Walpole) Limited |
0 MW | Consents Approved |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.