Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 5 of 46
ProjectCapacityStageConnection siteFrom
NatPower Hawthorn Pit Green Energy Park
Battery storage · Np Spv 29 Limited
1.0 GWScoping Wearside Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
NatPower Immingham Green Energy Park
Battery storage · Immingham Energy Storage Limited
1.0 GWAwaiting Consents Trent Valley North Connection Node F 400kV Substation
National Grid (England & Wales)
Oct 2034
NatPower Navenby Energy Park
Battery storage · Navenby Energy Limited
1.0 GWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
NatPower Nursling Energy Park
Battery storage · Southampton Energy Storage Limited
1.0 GWScoping Nursling 400kV Substation
National Grid (England & Wales)
Oct 2037
NatPower Oswestry Green Energy Park
Battery storage · Np Spv 43 Limited
1.0 GWScoping Cheshire Connection Node A2 400kV
National Grid (England & Wales)
Oct 2037
NatPower Penrith Green Energy Park
Battery storage · Leith Energy Limited
1.0 GWScoping Lancashire Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
NatPower Teesside Green Energy Park
Battery storage · Old Rides Energy Storage Limited
1.0 GWConsents Approved Teeside Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2035
Natpower Thimbleby Green Energy Park
Battery storage · Mowbray Energy Park Limited
1.0 GWScoping Trent Valley South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2033
NatPower Tilbury Green Energy Park
Battery storage · Natpower Marine UK Limited
1.0 GWScoping South Anglia Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Natpower Upsall Green Energy Park
Battery storage · Bellmoor Energy Park Limited
1.0 GWScoping North Humber Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2033
NatPower Yaxley Green Energy Park
Battery storage · Yaxley Energy Limited
1.0 GWScoping North Anglia Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
NatPower-Medway Energy Park
Battery storage · Old Rides Energy Storage Limited
1.0 GWScoping North Kent Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2034
Navenby Farm
Solar + storage · Coddington 10 Renewables Ltd
1.0 GWScoping Coddington 400kV Substation
National Grid (England & Wales)
Oct 2034
Necton High Impact Energy Hub
Solar + storage · Telis Energy UK Limited
1.0 GWScoping North Anglia Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Newchurch High Impact Energy Hub
Solar + storage · Telis Energy UK Limited
1.0 GWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Ninfield
Solar + storage · Ninfield 10 Renewables Limited
1.0 GWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
North Falls Offshore Wind Farm
Offshore wind · North Falls Offshore Wind Farm Limited
1.0 GWScoping North Falls Offshore Platform Substation
National Grid (England & Wales)
Oct 2030
Petroc Extension Offshore Wind Farm
Offshore wind · Bluefloat Energy UK Holdings Limited
1.0 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Dec 2036
Ratcliffe on Soar Farm
Solar + storage · Kegworth 10 Renewables Ltd
1.0 GWScoping Derbyshire Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2033
Rugby High Impact Green Energy Hub (HIGEH) 1
Solar + storage · Telis Energy UK Limited
1.0 GWScoping Enderby 400kV Substation
National Grid (England & Wales)
Oct 2037
Rye House
Solar + storage · Rye House 10 Renewables Limited
1.0 GWScoping London North East Connection Node A
National Grid (England & Wales)
Oct 2031
Sellindge West
Solar + storage · Sellindge West 10 Renewables Limited
1.0 GWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2033
Spalding High Impact Energy Hub
Solar + storage · Telis Energy UK Limited
1.0 GWScoping West Anglia Connection Node G 400kV Substation
National Grid (England & Wales)
Oct 2034
Spittal BESS Station
Battery storage · Igp Energy Storage 5 Limited
1.0 GWScoping Spittal 2 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
SPR CS1
Offshore wind · Scottish Power Renewables (UK) Limited
1.0 GWScoping Spr Cs1 275/66Kv Offshore Substation
National Grid (England & Wales)
Oct 2037
Stoke Bardolph
Solar + storage · Stoke Bardolph 10 Renewables Limited
1.0 GWScoping Trent Valley South Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2034
Stromar Offshore Windfarm
Offshore wind · Stromar Offshore Wind Farm Limited
1.0 GWScoping Greens 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
West Haddon
Solar · West Haddon 10 Renewables Limited
1.0 GWScoping Derbyshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
West Weybridge
Solar + storage · West Weybridge 10 Renewables Limited
1.0 GWScoping London North West Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2038
Wymondley Farm
Solar + storage · Wymondley 10 Renewables Ltd
1.0 GWScoping West Anglia Connection Node B 400Kv Substation
National Grid (England & Wales)
Oct 2032
Wymondley High Impact Green Energy Hub (HIGEH) 1
Solar + storage · Telis Energy UK Limited
1.0 GWScoping Wymondley 400kV Substation
National Grid (England & Wales)
Oct 2033
The Superconnection
Interconnector · Asc Energy plc
1.0 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2032
Bradford Solar Farm
Solar · SolarFour Ltd
960 MWScoping Staffordshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Buchan 01 Offshore Wind Farm
Offshore wind · Buchan Offshore Wind Limited
960 MWScoping Peterhead 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Scira-Dudgeon Extension
Offshore wind · Sheringham Shoal And Dudgeon Extensions Projco Limited
950 MWScoping Norwich Main 400kV Substation
National Grid (England & Wales)
Oct 2031
Spalding
Gas · Spalding Energy Company Ltd
950 MWBuilt Spalding North 400kV Substation
National Grid (England & Wales)
Norwich Main BESS
Solar + storage · Tasway Energy Park Limited
950 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2034
Trawsfynydd B Cwmni Egino
Nuclear · Cwmni Egino
940 MWScoping Trawsfynydd 275kV Substation
National Grid (England & Wales)
Nov 2037
Middleton Farm BESS
Battery storage · Bluestone Energy Ltd
937 MWScoping Middleton Farm 400Kv Substation
SP Transmission (south Scotland)
Oct 2033
Thornton Facility
Solar + storage · Balwen Limited
930 MWConsents Approved Thornton 400kV Substation
National Grid (England & Wales)
Oct 2032
Lacey's Farm BESS
Battery storage · Bluestone Energy Ltd
924 MWScoping South Anglia Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2033
Marchwood
Gas · Marchwood Power Limited
920 MWBuilt Marchwood 400kV Substation
National Grid (England & Wales)
Carrington Power Station
Gas · Carrington Power Limited
910 MWBuilt Carrington GSP (SP Manweb)
National Grid (England & Wales)
Keadby South Power Station
Gas · Keadby Generation Limited
910 MWBuilt Keadby 400kV Substation
National Grid (England & Wales)
Apr 2034
Medway Power Station
Gas · Medway Power Limited
910 MWBuilt Grain 400kV Substation
National Grid (England & Wales)
Oct 2028
Peterhead Carbon Capture
Gas · Sse Thermal Generation (Scotland) Limited
910 MWScoping Peterhead 275kV
SSEN Transmission (north Scotland)
Oct 2033
Protos Power Station
Gas · Keadby Generation Limited
910 MWScoping Merseyside Connection Node A 400Kv Substation
National Grid (England & Wales)
Nov 2037
Stallingborough Carbon Capture Ccgt
Gas · RWE Generation UK Plc
906 MWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
May 2035
Langage
Gas · Ep Langage Limited
905 MWBuilt Langage 400kV Substation
National Grid (England & Wales)
Alyth
Solar + storage · Ecodev (Alyth) Ltd
900 MWScoping Alyth Solar and Battery 400/132kV
SSEN Transmission (north Scotland)
Oct 2033
Page 5 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.