Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · NGETSellindge West
Sellindge West is a 1.0 GW solar + storage project in planning, connecting to the National Grid (England & Wales) network at East Kent connection node A 400kV Substation, with capacity due from October 2033. The connection agreement is held by Sellindge West 10 Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003412
- Customer
- Sellindge West 10 Renewables Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 1.0 GW
- Change in this agreement
- +1.0 GW
- Capacity effective from
- 31 October 2033
- Connection site
- East Kent connection node A 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
This project connects at a new substation (a “connection node”) that has not been built or located yet.
Projects connecting near East Kent connection node A · Grid map
Other projects at East Kent connection node A 400kV Substation
- Newchurch High Impact Energy HubSolar + storage · 1.0 GW · Scoping
- Dungeness Energy Park (Dungeness 400kV)Solar + storage · 500 MW · Scoping
- Gf Sellindge BESSBattery storage · 300 MW · Scoping
- Fairmead and Yewtree FarmBattery storage · 240 MW · Scoping
- Henley Downs Farm BESSBattery storage · 240 MW · Scoping
- Lightsource Newchurch PV/BESSSolar + storage · 240 MW · Scoping
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem