Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · NGETRatcliffe on Soar Farm
Ratcliffe on Soar Farm is a 1.0 GW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Derbyshire Connection Node C 400kV Substation, with capacity due from October 2033. The connection agreement is held by Kegworth 10 Renewables Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003871
- Customer
- Kegworth 10 Renewables Ltd
- Technology
- Demand, Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 1.0 GW
- Change in this agreement
- +1.0 GW
- Capacity effective from
- 30 October 2033
- Connection site
- Derbyshire Connection Node C 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
This project connects at a new substation (a “connection node”) that has not been built or located yet.
Projects connecting near Derbyshire Connection Node C · Grid map
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem