Langage

Langage is a 905 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Langage 400kV Substation. The connection agreement is held by Ep Langage Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000200
Customer
Ep Langage Limited
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
905 MW
Already connected
905 MW
Connection site
Langage 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Langage Β· Grid map

Other projects at Langage 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem