Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

NatPower Teesside Green Energy Park

NatPower Teesside Green Energy Park is a 1.0 GW battery storage project consented, connecting to the National Grid (England & Wales) network at Teeside Connection Node A 400kV Substation, with capacity due from October 2035. The connection agreement is held by Old Rides Energy Storage Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2035 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-004207
Customer
Old Rides Energy Storage Limited
Technology
Energy Storage System
Total capacity
1.0 GW
Change in this agreement
+1.0 GW
Capacity effective from
31 October 2035
Connection site
Teeside Connection Node A 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near Teeside Connection Node A · Grid map

Other projects at Teeside Connection Node A 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem