Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Lackenby PV & BESS Station

Lackenby PV & BESS Station is a 240 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Teeside Connection Node A 400kV Substation, with capacity due from October 2033. The connection agreement is held by Ib Vogt UK Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003551
Customer
Ib Vogt UK Ltd
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
240 MW
Change in this agreement
+240 MW
Capacity effective from
31 October 2033
Connection site
Teeside Connection Node A 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near Teeside Connection Node A · Grid map

Other projects at Teeside Connection Node A 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem