NESO TEC REGISTER · GREAT BRITAIN

Solar + storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown569220.5 GW in total
In planning513scoping or awaiting consent
Consented or building47closest to connecting
Built9connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

569 projects · page 12 of 12
ProjectCapacityStageConnection siteFrom
Somerford
Solar + storage · PD688IRO LTD
48 MWConsents Approved Minety 400kV Substation
National Grid (England & Wales)
Jun 2025
Southfields
Solar + storage · PD688IRO LTD
48 MWAwaiting Consents Minety 400kV Substation
National Grid (England & Wales)
Jun 2025
Willington East 1 (Tertiary)
Solar + storage · Enso Green Holdings U Limited
48 MWScoping Willington East 400kV Substation
National Grid (England & Wales)
Oct 2027
Willington East 2 (Tertiary)
Solar + storage · Enso Green Holdings Ss Limited
48 MWScoping Willington East 400kV Substation
National Grid (England & Wales)
Jul 2028
Claydon Solar B (A033)
Solar + storage · RWE Renewables UK Solar and Storage Limited
45 MWScoping Port Ham GSP
National Grid (England & Wales)
Apr 2025
Perwinnes
Solar + storage · Perwinnes Solar And Battery Storage Limited
45 MWConsents Approved Dyce 132/33kV GSP
SSEN Transmission (north Scotland)
Oct 2028
Frome Valley Energy Park
Solar + storage · Biosouth Energy Limited
43 MWScoping Chickerell-Mannington 400kV Substation
National Grid (England & Wales)
Oct 2039
Lamford Hill
Solar + storage · Benbrack Wind Farm Limited
42 MWScoping Benbrack Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Oct 2036
Norton PV and BESS
Solar + storage · Darlington Solar 1 Limited
41 MWConsents Approved Norton 275kV Substation
National Grid (England & Wales)
Oct 2027
Worset PV & BESS Park
Solar + storage · Worcestershire Solar 1 Limited
38 MWUnder Construction/Commissioning Hartmoor 275kV Substation
National Grid (England & Wales)
Oct 2027
St Marys Isle Solar Farm
Solar + storage · Grupotec Solar UK 5 Limited
36 MWConsents Approved Tongland 132/11kV
SP Transmission (south Scotland)
Jun 2030
South Brook
Solar + storage · JBM Solar Limited
36 MWAwaiting Consents Melksham 400kV Substation
National Grid (England & Wales)
Jun 2037
Tale Lane Solar / A008 Langford
Solar + storage · Jbm Solar Projects 2 Ltd
35 MWScoping Exeter GSP
National Grid (England & Wales)
Apr 2025
Montreathmont Moor Forest
Solar + storage · Montreathmont Energy Centre Limited
34 MWConsents Approved Lunanhead GSP
SSEN Transmission (north Scotland)
Oct 2026
Bilbo Farm
Solar + storage · Lel Bilbo Solar Limited
25 MWUnder Construction/Commissioning Strichen 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Jun 2024
Kincraig Energy Centre
Solar + storage · Kincraig Energy Centre Limited
21 MWUnder Construction/Commissioning Dyce 132/33kV GSP
SSEN Transmission (north Scotland)
Apr 2025
Lamford Hill
Solar + storage · Benbrack Wind Farm Limited
20 MWScoping Benbrack Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Aug 2029
Barns of Wedderburn (ABEI ENERGY GREEN VI)
Solar + storage · Abei Energy Limited
18 MWScoping Milton of Craigie GSP
SSEN Transmission (north Scotland)
Oct 2033
Keithick 16 Solar & BESS
Solar + storage · Sirius Ecodev (Keithick) Ltd
16 MWConsents Approved Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Dec 2026
Page 12 of 12

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.