Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINSolar + storage projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Somerford Solar + storage · PD688IRO LTD |
48 MW | Consents Approved |
| Southfields Solar + storage · PD688IRO LTD |
48 MW | Awaiting Consents |
| Willington East 1 (Tertiary) Solar + storage · Enso Green Holdings U Limited |
48 MW | Scoping |
| Willington East 2 (Tertiary) Solar + storage · Enso Green Holdings Ss Limited |
48 MW | Scoping |
| Claydon Solar B (A033) Solar + storage · RWE Renewables UK Solar and Storage Limited |
45 MW | Scoping |
| Perwinnes Solar + storage · Perwinnes Solar And Battery Storage Limited |
45 MW | Consents Approved |
| Frome Valley Energy Park Solar + storage · Biosouth Energy Limited |
43 MW | Scoping |
| Lamford Hill Solar + storage · Benbrack Wind Farm Limited |
42 MW | Scoping |
| Norton PV and BESS Solar + storage · Darlington Solar 1 Limited |
41 MW | Consents Approved |
| Worset PV & BESS Park Solar + storage · Worcestershire Solar 1 Limited |
38 MW | Under Construction/Commissioning |
| St Marys Isle Solar Farm Solar + storage · Grupotec Solar UK 5 Limited |
36 MW | Consents Approved |
| South Brook Solar + storage · JBM Solar Limited |
36 MW | Awaiting Consents |
| Tale Lane Solar / A008 Langford Solar + storage · Jbm Solar Projects 2 Ltd |
35 MW | Scoping |
| Montreathmont Moor Forest Solar + storage · Montreathmont Energy Centre Limited |
34 MW | Consents Approved |
| Bilbo Farm Solar + storage · Lel Bilbo Solar Limited |
25 MW | Under Construction/Commissioning |
| Kincraig Energy Centre Solar + storage · Kincraig Energy Centre Limited |
21 MW | Under Construction/Commissioning |
| Lamford Hill Solar + storage · Benbrack Wind Farm Limited |
20 MW | Scoping |
| Barns of Wedderburn (ABEI ENERGY GREEN VI) Solar + storage · Abei Energy Limited |
18 MW | Scoping |
| Keithick 16 Solar & BESS Solar + storage · Sirius Ecodev (Keithick) Ltd |
16 MW | Consents Approved |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.