United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESQueue requests in study in the USA (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project G0648, Klamath County Solar + storage |
1,400 MW | In study |
| Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 Gas |
1,166 MW | In study |
| Solar + storage project G0657, Klamath County Solar + storage |
1,000 MW | In study |
| Arida 3 Solar Farm Solar + storage |
900 MW | In study |
| Solar + storage project Q76, Kern County Solar + storage |
800 MW | In study |
| Onshore wind project 391 Onshore wind |
750 MW | Paused / redesign |
| Onshore wind project C012, Wheatland County Onshore wind |
750 MW | In study |
| Sunrise Power Improvement Gas |
656 MW | In study |
| Harquahala Sunrise Solar + storage |
618 MW | In study |
| Skylab Solar Solar ยท EDF Renewables Development, Inc. |
610 MW | In study |
| Battery storage project G0642, Crook County Battery storage |
600 MW | In study |
| Battery storage project G0643, Crook County Battery storage |
600 MW | In study |
| Old Aqueduct Solar Solar + storage ยท Old Aqueduct Solar |
512 MW | In study |
| Tabor Solar Solar ยท Quanah Solar LLC |
506 MW | In study |
| Frye Storage Solar + storage ยท Hecate Energy Frye Storage LLC |
504 MW | In study |
| Pinnington Storage Solar + storage ยท Hecate Energy Longhorn Storage LLC |
503 MW | In study |
| Solar + storage project Q334, Maricopa County Solar + storage |
500 MW | In study |
| Other project 390, Yellowstone County Other |
500 MW | In study |
| Solar + storage project 84, Pima County Solar + storage |
500 MW | In study |
| Battery storage project Q78, Kern County Battery storage |
500 MW | In study |
| Battery storage project G0656, Grant County Battery storage |
500 MW | In study |
| Solar project GEN-2020-087, Comanche County Solar |
500 MW | In study |
| Hawkins Solar Hybrid Solar + storage |
500 MW | In study |
| Dolphin Solar Solar ยท Dolphin Solar LLC |
450 MW | In study |
| Solar + storage project Q337, Yavapai County Solar + storage |
450 MW | In study |
| Solar + storage project Q352, Navajo County Solar + storage |
450 MW | In study |
| Solar + storage project Company 191, Clark County Solar + storage |
425 MW | Paused / redesign |
| Dragan Storage Solar + storage ยท Hecate Grid Dragan Storage LLC |
408 MW | In study |
| Mineral Basin Solar Power Solar ยท Mineral Basin Solar Power, LLC |
402 MW | In study |
| Sequoia Solar + storage |
400 MW | In study |
| Solar project G0651, Lake County Solar |
400 MW | In study |
| Onshore wind project GEN-2020-067, Terry County Onshore wind |
353 MW | In study |
| Onshore wind project Q347, Navajo County Onshore wind |
345 MW | In study |
| Gas project J1839, Macon County Gas |
340 MW | In study |
| Replace 330 MW of CLECO.DPS Unit with solar; Dolet Hills Other |
330 MW | In study |
| Solar + storage project GEN-2020-011, Phelps County Solar + storage |
320 MW | In study |
| Solar + storage project Q359, Pinal County Solar + storage |
315 MW | In study |
| Mensa BESS Battery storage ยท BRP Mensa BESS LLC |
307 MW | In study |
| Old Aqueduct Batt Solar + storage ยท Old Aqueduct LLC |
303 MW | In study |
| Brantley Branch Batt Battery storage ยท Brantley Branch LLC |
302 MW | In study |
| BRP Passu BESS Battery storage ยท BRP Passu BESS LLC |
302 MW | In study |
| Crater BESS Battery storage ยท BRP Crater BESS LLC |
302 MW | In study |
| Quela BESS Battery storage ยท BRP Quela BESS LLC |
301 MW | In study |
| Pleasant Grove Solar Solar ยท Deriva Energy Solar, LLC |
300 MW | In study |
| Butterfly Meadows Solar ยท Butterfly Meadows Solar Project, LLC |
300 MW | In study |
| Other project Q348, Coconino County Other |
300 MW | In study |
| Solar project J1710, Lee County Solar |
300 MW | In study |
| Solar + storage project Company 189, Clark County Solar + storage |
300 MW | Paused / redesign |
| Solar project J1712, Perry County Solar |
300 MW | In study |
| Other project 78, Apache County Other |
300 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)67 ยท 19.0 GW
- ERCOT (Texas)57 ยท 12.2 GW
- MISO (Midcontinent)56 ยท 9,500 MW
- PJM (Mid-Atlantic, Midwest)50 ยท 5,495 MW
- CAISO (California)9 ยท 3,749 MW
- Southeast (non-ISO utilities)29 ยท 2,767 MW
- NYISO (New York)19 ยท 2,230 MW
- SPP (Southwest Power Pool)10 ยท 2,198 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)