🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Solar queue requests in study in the USA

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,074300.4 GW
Active in queue427.5 GW2,995 requests
Agreement signed108.2 GW781 requests
Withdrawn9,252860.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,074 requests · page 1 of 42
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project G0678, Morrow County
Solar
1,200 MWIn study Morrow, ORWest Jun 2021target 2024
Spectra Solar
Solar · SE DC Devco
1,200 MWIn study Scurry, TXERCOT Dec 2025target 2028
Pumpville Ranch 1
Solar
1,000 MWPaused / redesign Val Verde, TXERCOT
Solar project J4161, Watonwan County
Solar
1,000 MWIn study Watonwan, MNMISO Sep 2025target 2030
Solar project Q274, Coconino County
Solar
1,000 MWIn study Coconino, AZWest Mar 2018target 2024
Solar project AH2-351
Solar
1,000 MWIn study KYPJM Mar 2022target 2027
Solar project AH2-353
Solar
1,000 MWIn study KYPJM Mar 2022target 2028
Solar project G0687, Sherman County
Solar
900 MWIn study Sherman, ORWest Aug 2021target 2024
Solar project J2186, Fulton County
Solar
821 MWIn study Fulton, ILMISO Jun 2022target 2024
Shadow Ranch Solar
Solar · LectricWind LLC
808 MWIn study Upton, TXERCOT Sep 2022target 2026
Indigo Solar 3
Solar · Indigo solar 3
800 MWIn study Fisher, TXERCOT Oct 2024target 2028
Solar project AH2-348, Daviess County
Solar
700 MWIn study Daviess, INPJM Mar 2022target 2025
Solar project J2846, Pulaski County
Solar
700 MWIn study Pulaski, INMISO Sep 2022target 2025
Solar project J2261, Jackson County
Solar
625 MWIn study Jackson, ARMISO Oct 2021target 2028
Solar project J2262, Jackson County
Solar
625 MWIn study Jackson, ARMISO Oct 2021target 2028
Skylab Solar
Solar · EDF Renewables Development, Inc.
610 MWIn study Wharton, TXERCOT Jun 2020target 2025
Rocking X Solar
Solar · 7100 Tin Top LLC
602 MWIn study Parker, TXERCOT Oct 2023target 2027
Scorpius Solar
Solar · Ben Milam Solar 4
600 MWIn study Milam, TXERCOT Dec 2024target 2029
Solar project G0669, Crook County
Solar
600 MWIn study Crook, ORWest Feb 2021target 2027
Solar project J2477, Crittenden County
Solar
600 MWIn study Crittenden, ARMISO Sep 2022target 2026
Solar project J2519, Richland Parish County
Solar
600 MWIn study Richland Parish, LAMISO Sep 2022target 2026
Solar project G0673, Crook County
Solar
600 MWIn study Crook, ORWest Mar 2021target 2028
Capoterra
Solar
598 MWPaused / redesign Milam, TXERCOT Jun 2022
Brittlebush Solar
Solar
594 MWPaused / redesign Henderson, TXERCOT Jun 2022
Jenna Eco-Electric Solar
Solar · Clean Energy Holdings, LLC
576 MWIn study Fisher, TXERCOT May 2024target 2028
Soledad Solar
Solar
562 MWIn study Kern, CACAISO Apr 2023target 2028
Domestic Chicken
Solar
559 MWIn study Maricopa, AZCAISO Apr 2023target 2029
Solar project J2478, Craighead County
Solar
550 MWIn study Craighead, ARMISO Sep 2022target 2026
Solar project J4102, Cass County
Solar
539 MWIn study Cass, MIMISO Oct 2025target 2029
Point Mountain Solar
Solar
514 MWPaused / redesign Upton, TXERCOT Jul 2022target 2026
Solar project GEN-2021-030, Linn County
Solar
510 MWIn study Linn, KSSPP May 2021target 2026
Velveteen Solar I
Solar · Velveteen Solar, LLC
509 MWIn study Baylor, TXERCOT Dec 2025target 2029
Bayside Solar
Solar
509 MWPaused / redesign Victoria, TXERCOT Feb 2021target 2026
Torbino Solar
Solar
507 MWIn study Kern, CACAISO Apr 2023target 2029
Tabor Solar
Solar · Quanah Solar LLC
506 MWIn study Hardeman, TXERCOT Sep 2020target 2027
Big Field Solar
Solar · Big Field Solar Energy LLC
506 MWIn study Wilbarger, TXERCOT Jun 2025target 2029
Muy Grande Solar
Solar · ACE DevCo NC, LLC
503 MWIn study Starr, TXERCOT Jan 2024target 2029
Dog Star Solar II
Solar · Dog Star Solar LLC
503 MWIn study Taylor, TXERCOT Jul 2025target 2027
Dog Star Solar I
Solar · Dog Star Solar LLC
503 MWIn study Taylor, TXERCOT Jul 2025target 2027
Commodus Solar
Solar · IP Blackwell, LLC
502 MWIn study Briscoe, TXERCOT Jul 2024target 2029
Cavell Solar
Solar · IP Cavell, LLC
502 MWIn study Castro, TXERCOT Jul 2024target 2029
Commodus 2 Solar
Solar · IP Blackwell II, LLC
502 MWIn study Swisher, TXERCOT Mar 2025target 2029
Titus Sienta Solar
Solar · Sol Sienta Solar, LLC
502 MWIn study Pecos, TXERCOT Oct 2023target 2028
Solar project 5RSC-2024-22, Crowley County
Solar
500 MWIn study Crowley, COWest Jan 2024target 2027
MRR Solar
Solar · BOULEVARD ASSOCIATES, LLC
500 MWIn study Pecos, TXERCOT Jul 2025target 2030
Elk Ridge Solar
Solar · Boulevard Associates, LLC
500 MWIn study Pecos, TXERCOT Nov 2025target 2030
Solar project J2395, Calhoun County
Solar
500 MWIn study Calhoun, ARMISO Sep 2022target 2025
Solar project G1032, Grant County
Solar
500 MWIn study Grant, WAWest Nov 2023target 2028
Solar project J2708, Ouachita Parish County
Solar
500 MWIn study Ouachita Parish, LAMISO Sep 2022target 2027
Solar project J2704, Ouachita Parish County
Solar
500 MWIn study Ouachita Parish, LAMISO Sep 2022target 2027
Page 1 of 42

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)