United States › Grid › Interconnection queues › Kansas
SOLAR · SPPSolar project GEN-2021-030, Linn County
Solar project GEN-2021-030, Linn County is a 510 MW solar request in interconnection study in the SPP interconnection queue, in Linn County, Kansas, connecting to KCPL.
Queue statusIn planning
- PlanningQueued May 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2021-030
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- KCPL
- Connection point (POI)
- Evergy Tap the La Cygne to Stillwel 345 kV Line
- Location
- Linn County, Kansas
- Technology
- Solar: 510 MW
- Total requested
- 510 MW
- Service type
- Energy only (ERIS)
- Study phase
- FACILITY STUDY STAGE
- Queue status
- Active
- Entered queue
- 14 May 2021
- Proposed online date
- December 2026
Location
Marker shows the centre of Linn County; the queue data does not give exact sites.
Other requests in Linn County
- Solar + storage project GEN-2020-007, Linn CountySolar + storage · 650 MW · agreement signed
- Battery storage project GEN-2021-029, Linn CountyBattery storage · 254 MW · in study
- Solar project GEN-2018-054, Linn CountySolar · 120 MW · withdrawn
- Battery storage project GEN-2018-114, Linn CountyBattery storage · 40.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem