United States βΊ Grid βΊ Interconnection queues βΊ Kansas
SOLAR Β· SPPSolar project GEN-2018-054, Linn County
Solar project GEN-2018-054, Linn County is a 120 MW solar request withdrawn in the SPP interconnection queue, in Linn County, Kansas, connecting to GMO.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2018 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2018-054
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- GMO
- Connection point (POI)
- KC South - N. Raymore 161kV Line
- Location
- Linn County, Kansas
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 May 2018
- Proposed online date
- December 2026
- Withdrawn
- October 2023
Location
Marker shows the centre of Linn County; the queue data does not give exact sites.
Other requests in Linn County
- Solar + storage project GEN-2020-007, Linn CountySolar + storage Β· 650 MW Β· agreement signed
- Solar project GEN-2021-030, Linn CountySolar Β· 510 MW Β· in study
- Battery storage project GEN-2021-029, Linn CountyBattery storage Β· 254 MW Β· in study
- Battery storage project GEN-2018-114, Linn CountyBattery storage Β· 40.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem