United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas (2018 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Danish Fields Solar Solar · Danish Fields Solar, LLC |
603 MW | Agreement signed |
| Siete Onshore wind · Apex Clean Energy |
493 MW | Agreement signed |
| Green Holly Solar Solar · Copenhagen Infrastructure Partners Fund IV |
414 MW | Paused / redesign |
| Baird North Wind Onshore wind · BMP Wind, LLC |
340 MW | Agreement signed |
| Quantum Solar Solar + storage · IP QUANTUM II, LLC |
322 MW | Agreement signed |
| Delilah Solar 2 Solar · Delilah Solar Energy II LLC |
318 MW | Agreement signed |
| El Sauz Ranch Onshore wind · El Sauz Ranch Wind, LLC |
302 MW | Agreement signed |
| Pine Forest Solar Solar · Pine Forest Solar I, LLC |
302 MW | Agreement signed |
| Delilah Solar 1 Solar · Delilah Solar Energy LLC |
300 MW | Agreement signed |
| Arroyo Del Bisonte Solar Solar · Sunchase Power |
300 MW | Paused / redesign |
| Pierce Wind Onshore wind |
300 MW | Paused / redesign |
| Onshore wind project GEN-2018-099, Parmer County Onshore wind |
300 MW | Agreement signed |
| Shifting Gale Wind Onshore wind |
289 MW | Paused / redesign |
| Foxtrot Wind Onshore wind · Lincoln Clean |
268 MW | Agreement signed |
| Red Holly Solar Solar + storage · GreenGo Energy |
260 MW | Agreement signed |
| Tulsita Solar Solar · Ray Ranch Solar LLC |
256 MW | Agreement signed |
| Maleza Solar Solar + storage · Brush Solar LLC |
255 MW | Agreement signed |
| Roseland Solar Solar · Enel Green Power Roseland Solar, LLC |
254 MW | Agreement signed |
| Solar project GEN-2018-015, Cottle County Solar |
252 MW | Agreement signed |
| Adamstown Solar Solar · Adams Creek Solar Project, LLC |
251 MW | Agreement signed |
| Samson Solar 1 Solar · Samson Solar Energy LLC |
250 MW | Agreement signed |
| Eastbell Milam Solar Solar · EDP RENEWABLES NORTH AMERICA LLC |
245 MW | Agreement signed |
| Peyton Creek Wind II Onshore wind · RWE Renewables Development, LLC |
241 MW | Agreement signed |
| Gulf Wind 2 Onshore wind |
227 MW | Paused / redesign |
| Castro Solar Solar · Castro Solar One, LLC |
225 MW | Agreement signed |
| Walleye Solar Solar · Sandow Lakes Ranch Solar II, LLC |
215 MW | In study |
| Diamondback solar Solar · Diamondback Solar, LLC |
204 MW | Agreement signed |
| Rueter Solar Solar |
200 MW | Paused / redesign |
| Desert Rose Solar Solar |
200 MW | Paused / redesign |
| Onshore wind project GEN-2018-089, Castro County Onshore wind |
196 MW | Agreement signed |
| Fagus Solar Park 1 SLF Solar + storage · Excel Advantage Services, LLC dba Misae Solar Park II |
166 MW | Agreement signed |
| CAROL wind Onshore wind |
165 MW | Paused / redesign |
| Solar project GEN-2018-003, Bowie County Solar |
150 MW | Agreement signed |
| Indigo Solar Solar + storage · Innovative Solar 245, LLC |
150 MW | Agreement signed |
| La Casa Wind Onshore wind · LA CASA WIND, LLC |
148 MW | Agreement signed |
| Wang Solar SLF Solar + storage · BT Yixin Solar, LLC |
145 MW | In study |
| Starr Solar Ranch Solar + storage · Starr Solar Ranch 1 LLC |
137 MW | Agreement signed |
| Arroyo Solar Solar + storage · BT Cantwell Solar, LLC |
100 MW | Agreement signed |
| Tyson Nick Solar Solar · Tyson Nick Solar Project, LLC |
90.0 MW | Paused / redesign |
| R Massengale Gas |
58.0 MW | Paused / redesign |
| Red Holly Storage Solar + storage · GreenGo Energy |
50.0 MW | Agreement signed |
| Red Holly Storage 1 Solar + storage · GreenGo Energy |
50.0 MW | Agreement signed |
| SP TX-12B Phase III Solar · ConEd Development |
40.0 MW | In study |
| Half Moon Battery Battery storage |
30.2 MW | Paused / redesign |
| Brandon Gas |
21.0 MW | Paused / redesign |
| Air Products GCA Gas · Air Products |
14.0 MW | Agreement signed |
| Blue Summit repower Onshore wind |
9.9 MW | Paused / redesign |
| Indian Mesa repower Onshore wind · Nextera |
9.3 MW | Agreement signed |
| Sweetwater 1 repower Onshore wind · Leeward Energy |
3.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)