🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in Texas (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown17734.7 GW
Active in queue58.6 GW293 requests
Agreement signed23.9 GW116 requests
Withdrawn8117.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

177 requests · page 1 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Southeast Oklahoma Pumped Storage
Other · Apex Energy Solutions, LLC
1,232 MWIn study Lamar, TXERCOT Aug 2022target 2030
Shadow Ranch Solar
Solar · LectricWind LLC
808 MWIn study Upton, TXERCOT Sep 2022target 2026
Tempesta BESS
Battery storage
600 MWPaused / redesign Kaufman, TXERCOT Jun 2022
Capoterra BESS
Battery storage
600 MWPaused / redesign Milam, TXERCOT Jun 2022
Capoterra
Solar
598 MWPaused / redesign Milam, TXERCOT Jun 2022
Brittlebush BESS
Battery storage
597 MWPaused / redesign Henderson, TXERCOT Jun 2022
Brittlebush Solar
Solar
594 MWPaused / redesign Henderson, TXERCOT Jun 2022
Point Mountain Solar
Solar
514 MWPaused / redesign Upton, TXERCOT Jul 2022target 2026
Tres Rios Ranch Solar
Solar + storage · LectricWind LLC
508 MWIn study Upton, TXERCOT Aug 2022target 2027
Bayside BESS
Battery storage
508 MWPaused / redesign Victoria, TXERCOT Mar 2022
Hiru Storage
Solar + storage · Hecate Energy Hazel LLC
504 MWIn study Clay, TXERCOT Nov 2022target 2029
Hollow Branch Creek Storage
Solar + storage · Hollow Branch Creek Solar LLC
460 MWIn study Leon, TXERCOT Sep 2022target 2027
Tempesta
Solar
443 MWPaused / redesign Kaufman, TXERCOT Jun 2022
Smith Lake Solar DC
Solar + storage · Smith Lake Solar
402 MWIn study Grimes, TXERCOT Feb 2022target 2028
Bottom Grass Solar II
Solar + storage · Flint Rock Solar Project, LLC
402 MWIn study Colorado, TXERCOT Nov 2022target 2028
Earthwise Solar
Solar · Quanah Solar 2
371 MWIn study Hardeman, TXERCOT Mar 2022target 2026
Sombrero Solar
Solar · Aurora Solar LLC
352 MWIn study Schleicher, TXERCOT Mar 2022target 2028
HyFuels Green Lake Solar
Solar · HyFuels Green Lake Solar LLC
347 MWIn study Victoria, TXERCOT Sep 2022target 2027
Royal River BESS
Battery storage · Royal River LLC
311 MWIn study Brazoria, TXERCOT Mar 2022target 2027
Glory Bee Solar
Solar + storage · Riley Solar LLC
305 MWIn study Erath, TXERCOT Jun 2022target 2026
Lake Henry Wind
Onshore wind
305 MWPaused / redesign Kent, TXERCOT Sep 2022target 2027
Academy Wind
Onshore wind
305 MWPaused / redesign Dickens, TXERCOT Sep 2022target 2028
Furay Battery Energy Storage System
Battery storage · Blue Topaz 1, LLC
304 MWIn study Harris, TXERCOT Sep 2022target 2027
HyFuels Calhoun Solar
Solar · HyFuels Green Lake Solar LLC
302 MWIn study Victoria, TXERCOT Oct 2022target 2027
Triangle Ranch Alpha
Onshore wind · Triangle Ranch Wind
302 MWIn study Cottle, TXERCOT Oct 2022target 2029
Photo Solar 2
Solar + storage · CED Development Inc.
300 MWIn study Uvalde, TXERCOT Sep 2022target 2027
Solar project J3045, Orange County
Solar
300 MWIn study Orange, TXMISO Sep 2022target 2026
Camino Ranch Storage SLF
Solar + storage · Camino Solar Ranch, LLC
298 MWIn study Houston, TXERCOT Oct 2022target 2028
Camino Ranch Solar SLF
Solar + storage · Camino Ranch Solar Project LLC
296 MWIn study Houston, TXERCOT Oct 2022target 2028
Masava Storage
Battery storage · Savannah Oaks Solar Project, LLC
257 MWIn study Madison, TXERCOT Sep 2022target 2028
Bayside 2 BESS
Battery storage
252 MWPaused / redesign Dewitt, TXERCOT Mar 2022
Best Southwest BESS
Battery storage
241 MWPaused / redesign Dallas, TXERCOT May 2022target 2025
Bora Bora Solar
Solar
233 MWPaused / redesign Wichita, TXERCOT Sep 2022
Petunia Storage Project
Battery storage · Petunia Storage Project LLC
232 MWIn study Milam, TXERCOT Mar 2022target 2027
Rubicon Echo Wind
Onshore wind
228 MWPaused / redesign Haskell, TXERCOT May 2022
White Tail Solar
Solar · Mule Deer Solar LLC
227 MWIn study Deaf Smith, TXERCOT Feb 2022target 2027
Dunkel BESS
Battery storage · Momentum Energy Storage Partners
226 MWIn study Lubbock, TXERCOT Jun 2022target 2027
Olympic BESS
Battery storage · SMT Olympic BESS LLC
223 MWIn study Nueces, TXERCOT Oct 2022target 2027
Shoshana Storage
Battery storage · Shoshana Storage Project LLC
221 MWIn study Matagorda, TXERCOT Mar 2022target 2028
Sepanta Solar
Solar · BREG - Belgian Renewable Energy Group
217 MWIn study Nolan, TXERCOT Oct 2022target 2029
Puerto Del Sol 2
Solar · PUERTO DEL SOL, LLC
214 MWIn study Cameron, TXERCOT May 2022target 2027
Puerto Del Sol 1
Solar · PUERTO DEL SOL, LLC
214 MWIn study Cameron, TXERCOT May 2022target 2026
Bessie Storage
Battery storage · Bessie Energy Storage, LLC
211 MWIn study Starr, TXERCOT Feb 2022target 2026
Forts Trail BESS
Solar + storage · JC Central Bluff, LLC
209 MWIn study Taylor, TXERCOT Jun 2022target 2028
St. Gall Solar
Solar · St. Gall Solar LLC
207 MWIn study Pecos, TXERCOT Feb 2022target 2026
Rock N' Roll Storage Two
Solar + storage · Rock N‚Äô Roll Solar, LLC
206 MWIn study Brazoria, TXERCOT Feb 2022target 2027
Soda Lake BESS 2 SLF
Solar + storage · Crane II Solar Electric, LLC
205 MWIn study Crane, TXERCOT Sep 2022target 2027
Citrus Grove Energy Storage
Battery storage
205 MWPaused / redesign Hidalgo, TXERCOT Nov 2022target 2026
Urca Solar
Solar
204 MWPaused / redesign Live Oak, TXERCOT Apr 2022
Hoskins Solar
Solar · SGT HOSKINS SOLAR PROJECT, LLC
204 MWIn study Lamar, TXERCOT Oct 2022target 2026
Page 1 of 4

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)