Withdrawn queue requests in California (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown467,276 MW
Active in queue40.5 MW2 requests
Agreement signed40.5 MW2 requests
Withdrawn467,276 MW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

46 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Rio Hondo Power
Gas
1,047 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2013target 2019
Center Power
Gas
910 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2013target 2024
Ventura Clean Energy
Gas
778 MWWithdrawn / abandoned Ventura, CACAISO Apr 2013target 2019
Drew Road Generation
Gas
344 MWWithdrawn / abandoned Imperial, CACAISO Apr 2013target 2018
Solar project Q43, Kern County
Solar
300 MWWithdrawn / abandoned Kern, CAWest Jun 2013target 2016
Heca SCS
Other
300 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2019
Blue Star Wind Energy Center
Onshore wind
250 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2017
Fremont Valley Preservation
Solar
245 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2016
Calpeak Border Om 2
Gas
205 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2017
Kramer Solar
Solar
200 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2013target 2016
WP Oceanside
Gas
200 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2017
WP Goleta (Fka WP Oxnard)
Gas
200 MWWithdrawn / abandoned Ventura, CACAISO Apr 2013target 2018
WP Walnut
Gas
200 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2013target 2017
Rancho Wistaria Solar Energy Center
Solar
150 MWWithdrawn / abandoned Imperial, CACAISO Apr 2013target 2016
Three Peaks Wind
Onshore wind
150 MWWithdrawn / abandoned Kings, CACAISO Apr 2013target 2016
Kings Solar 4
Solar
150 MWWithdrawn / abandoned Kings, CACAISO Apr 2013target 2016
Maricopa 4 Solar Project
Solar
150 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2016
Quartz 3 Solar
Solar
150 MWWithdrawn / abandoned Riverside, CACAISO Apr 2013target 2021
GV Solar 3
Solar
120 MWWithdrawn / abandoned Tulare, CACAISO Apr 2013target 2017
Pio Pico 2
Gas
110 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2017
Algonquin Power Sanger 2
Gas
108 MWWithdrawn / abandoned CACAISO Apr 2013target 2020
WP Pendleton
Gas
99.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
WP Fallbrook
Gas
99.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
DRY Creek (Fka Jasmin Power 3)
Gas
86.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2017
Benicia Wind
Onshore wind
65.0 MWWithdrawn / abandoned Solano, CACAISO Apr 2013target 2016
Transfer Ridge Wind
Onshore wind
60.0 MWWithdrawn / abandoned Butte, CACAISO Apr 2013target 2016
Huntington Beach 2
Gas
59.3 MWWithdrawn / abandoned Orange, CACAISO Apr 2013target 2023
Lerdo Solar
Solar
50.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2015
El Cajon Energy Center 2
Gas
49.9 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2015
WP Vande
Gas
49.9 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
Lost Hills Cogen
Gas
47.8 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2017
Midway Hills Cogen
Gas
47.8 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2017
Golden Oasis
Solar
33.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2021
Fox Solar
Solar
30.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
Timba Solar
Solar
20.0 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2013target 2016
Lasalle Solar Project
Solar
20.0 MWWithdrawn / abandoned Kings, CACAISO Apr 2013target 2016
Kasson Manteca Solar
Solar
20.0 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2013target 2018
Pismo Solar
Solar
20.0 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2013target 2015
Border Solar
Solar
20.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2015
East Nicolaus Solar
Solar
20.0 MWWithdrawn / abandoned Sutter, CACAISO Apr 2013target 2015
Maricopa West Solar PV 2
Solar
20.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2017
Valley Center Solar
Solar
20.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2015
Livermore Solar
Solar
20.0 MWWithdrawn / abandoned Alameda, CACAISO Apr 2013target 2015
Felipe Solar
Solar
20.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2015
STS Solar
Solar
16.0 MWWithdrawn / abandoned Sonoma, CACAISO Apr 2013target 2015
Lake Clementine Hydroelectric
Hydro
15.5 MWWithdrawn / abandoned Placer, CACAISO Apr 2013target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)