SOLAR Β· CAISO

Livermore Solar

Livermore Solar is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Alameda County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2013 (completed)
  2. Withdrawn / abandonedMar 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
951
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Vasco 60kV Substation
Location
Alameda County, California
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2013
Proposed online date
August 2015
Withdrawn
March 2014

Location

Marker shows the centre of Alameda County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Alameda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem