United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR Β· CAISOGV Solar 3
GV Solar 3 is a 120 MW solar request withdrawn in the CAISO interconnection queue, in Tulare County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2013 (completed)
- Withdrawn / abandonedMar 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 947
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Olive Substation 115 kV
- Location
- Tulare County, California
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 April 2013
- Proposed online date
- December 2017
- Withdrawn
- March 2014
Location
Marker shows the centre of Tulare County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Tulare County
- Rexford 2 Solar FarmSolar + storage Β· 400 MW Β· agreement signed
- Ariella SolarSolar + storage Β· 327 MW Β· agreement signed
- AngelaSolar + storage Β· 60.0 MW Β· agreement signed
- Lake Alpaugh Battery StorageBattery storage Β· 10.0 MW Β· agreement signed
- MusketeersSolar + storage Β· 1,047 MW Β· in study
- SolskenSolar + storage Β· 809 MW Β· in study
- Mineral King SolarSolar + storage Β· 430 MW Β· in study
- SequoiaSolar + storage Β· 400 MW Β· in study
- Bobor StorageBattery storage Β· 152 MW Β· in study
- Rexford Solar FarmSolar + storage Β· 540 MW Β· built
- Alpaugh PV Solar Generation FacilitySolar Β· 50.0 MW Β· built
- White River PV 20MVA Solar Generation FacilitySolar Β· 20.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem