United States β€Ί Grid β€Ί Interconnection queues β€Ί California

GAS Β· CAISO

Rio Hondo Power

Rio Hondo Power is a 1,047 MW gas request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2013 (completed)
  2. Withdrawn / abandonedApr 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
991
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Rio Hondo Substation 230kV
Location
Los Angeles County, California
Technology
Gas: 1,047 MW
Total requested
1,047 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2013
Proposed online date
January 2019
Withdrawn
April 2014

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem