Completed queue projects in ISO-NE (New England)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown22816.5 GW
Active in queue14.6 GW72 requests
Agreement signed8,609 MW45 requests
Withdrawn982118.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

228 requests Β· page 1 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Seabrook Power Uprate7
Nuclear
1,265 MWOperating Rockingham, NHISO-NE Jan 2003target 2006
Northfield Mt. Equipment Replacement
Battery storage
1,180 MWOperating Franklin, MAISO-NE Jun 2007target 2008
Cricket Valley Project (QP444 in NYISO Queue)
Gas
1,020 MWOperating Dutchess, NYISO-NE Dec 2014target 2020
Millstone 2 Upgrade7
Nuclear
906 MWOperating New London, CTISO-NE Aug 2002target 2004
CPV Towantic Energy Center
Gas
745 MWOperating New Haven, CTISO-NE Dec 2011target 2018
Footprint Combined Cycle Unit
Gas
716 MWOperating Essex, MAISO-NE Jan 2012target 2013
VT Yankee Nuclear Power Station Upgrade7
Nuclear
642 MWOperating Windham, VTISO-NE Dec 2002target 2006
Kleen Energy Project
Gas
620 MWOperating Middlesex, CTISO-NE Nov 2001target 2011
Bridgeport Energy PSS Tuning
Gas
588 MWOperating Fairfield, CTISO-NE Feb 2016target 2016
PSEG Bridgeport Harbor CCGT Expansion
Gas
510 MWOperating Fairfield, CTISO-NE Feb 2013target 2019
Manchester Street Station increase
Gas
492 MWOperating Providence, RIISO-NE May 2010target 2010
Wallingford GT Uprate
Gas
350 MWOperating New Haven, CTISO-NE Apr 2018target 2022
Canal 3
Gas
333 MWOperating Barnstable, MAISO-NE Mar 2014target 2019
Bear Swamp Pump Load increase
Battery storage
333 MWOperating Berkshire, MAISO-NE May 2022target 2023
Bear Swamp Pumping Load Increase
Battery storage
333 MWOperating Berkshire, MAISO-NE Nov 2021target 2021
Tiverton Uprate
Gas
306 MWOperating Newport, RIISO-NE Mar 2020target 2021
Kendall Revised Reconfiguration Project
Gas
250 MWOperating Middlesex, MAISO-NE Oct 2015target 2016
Medway Peaker - SEMARI
Gas
208 MWOperating Norfolk, MAISO-NE May 2014target 2019
Altresco Increase (winter)
Gas
193 MWOperating Berkshire, MAISO-NE Feb 2011target 2012
Bingham Wind
Onshore wind
185 MWOperating Somerset, MEISO-NE May 2010target 2016
Cross Town Battery Storage
Battery storage
175 MWOperating Cumberland, MEISO-NE Apr 2019target 2025
Cranberry Point Energy Storage
Battery storage
150 MWOperating Plymouth, MAISO-NE Mar 2018target 2025
Oakfield II Wind - Keene Road
Onshore wind
136 MWOperating Aroostook, MEISO-NE Aug 2008target 2012
New Haven Harbor 2-4
Gas
130 MWOperating New Haven, CTISO-NE Feb 2008target 2012
Millinocket Frequency Conversion
Hydro
126 MWOperating Penobscot, MEISO-NE Feb 2015target 2019
Great Northern - Millinocket
Hydro
126 MWOperating Penobscot, MEISO-NE Dec 2001target 2003
Millinocket Battery additon
Other
126 MWOperating Penobscot, MEISO-NE Apr 2019target 2020
Downeast Wind
Onshore wind
126 MWOperating Washington, MEISO-NE Apr 2018target 2024
Three Corners Solar
Solar
110 MWOperating Somerset, MEISO-NE Jul 2017target 2024
Thomas A. Watson Generating Station
Gas
108 MWOperating Norfolk, MAISO-NE Aug 2006target 2009
Wallingford Energy Center
Gas
100 MWOperating New Haven, CTISO-NE Feb 2014target 2018
A. L. Pierce
Gas
99.6 MWOperating New Haven, CTISO-NE Dec 2005target 2007
Waterbury Generating Facility
Gas
95.7 MWOperating New Haven, CTISO-NE Feb 2007target 2009
Granite Reliable Power
Onshore wind
94.5 MWOperating Coos, NHISO-NE Aug 2006target 2012
Bridgeport Energy Uprate
Gas
84.0 MWOperating Fairfield, CTISO-NE Jun 2014target 2015
Farminton Solar
Solar
78.4 MWOperating Franklin, MEISO-NE Aug 2015target 2021
Waterside Power, LLC
Other
74.1 MWOperating Fairfield, CTISO-NE Oct 2003target 2004
L'Energia
Gas
74.0 MWOperating Middlesex, MAISO-NE Jul 2007target 2009
Weaver Wind
Onshore wind
72.6 MWOperating Hancock, MEISO-NE Jul 2013target 2020
Increase Existing Capacity
Nuclear
70.0 MWOperating New London, CTISO-NE Nov 2006target 2008
RISEP Increase
Gas
66.0 MWOperating Providence, RIISO-NE May 2010target 2012
Kibby Wind Project
Onshore wind
65.0 MWOperating Franklin, MEISO-NE Sep 2005target 2009
Simple Cycle Gas Turbine
Gas
61.9 MWOperating Essex, MAISO-NE Jul 2016target 2024
Kingdom Community Wind
Onshore wind
61.5 MWOperating Orleans, VTISO-NE Sep 2009target 2012
Western Maine Wind Project
Onshore wind
58.8 MWOperating Somerset, MEISO-NE May 2020target 2024
Burgess BioPower
Other
58.7 MWOperating Coos, NHISO-NE Feb 2008target 2014
CPV Towantic Increase
Gas
55.5 MWOperating New Haven, CTISO-NE Mar 2015target 2018
Hancock Wind Project
Onshore wind
51.0 MWOperating Hancock, MEISO-NE Aug 2012target 2016
Record Hill Wind
Onshore wind
50.6 MWOperating Oxford, MEISO-NE Jan 2007target 2012
Gravel Pit Solar
Solar
50.0 MWOperating Hartford, CTISO-NE Jun 2019target 2024
Page 1 of 5

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)